My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-169 Amendment 1
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2015-169 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2018 3:03:05 PM
Creation date
3/16/2017 11:11:11 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-169
Contractor Name
West Reservoir and Ditch Company
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
WEST RESERVOIR AND DITCH COMPANY <br /> Est 1908 <br /> ID 19871048230 <br /> P.O Box 25, Paonia, CO 81428 <br /> Board Resolution <br /> Feb 10, 2017 <br /> The Board of West Reservoir and Ditch Company, by signature hereby resolves: <br /> A the repair of the reservoir outlet works on West Reservoir#1 was completed Sept 181 , <br /> 2016 <br /> B the Office of the State Engineer, Dam Safety, has given temporary permission to fill the <br /> reservoir for the 2017 irrigation season <br /> C the demolition and reconstruction costs exceeded the initial estimates, due to existing <br /> unsuitable dam material, unforeseen springs in the bottom of the dam <br /> D the Board has therefor approved a request to the Colorado Water Conservation Board <br /> for an increase in loan no.CT 2015-169 CMS 95578 (orig CMS 74840) by an additional <br /> $64,640.00 to cover the additional construction costs. <br /> Nick Hughes #Garyton <br /> President Vice President <br /> Karla Tschoepe Seal <br /> Secretary <br /> Appendix E <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.