Laserfiche WebLink
H. The BORROWER shall conduct a pre-construction conference at which time the CWCB <br /> staff shall have the opportunity to review and approve the construction schedule. <br /> I. If the CWCB staff determines that the PROJECT requires a resident inspector during <br /> construction, the BORROWER shall employ an inspector who has been approved by the <br /> CWCB staff. <br /> J. The BORROWER shall construct the PROJECT in accordance with the approved plans and <br /> specifications. <br /> K. Upon completion of the PROJECT construction, the BORROWER shall provide as-built <br /> drawings of the PROJECT to the CWCB staff, or, if required by § 37-87-105, C.R.S., the <br /> BORROWER shall provide the as-built drawings to the State Engineer's Office for <br /> approval and filing. <br /> L. Upon completion of the PROJECT construction, the BORROWER shall arrange a final <br /> inspection for the CWCB staff. <br /> M. The BORROWER shall pay all of the expenses related to the PROJECT when such bills are <br /> due. <br /> SECTION 9-ELIGIBLE EXPENSES. <br /> The following items are eligible for loan disbursements: <br /> A. Preparing final designs and specifications for the PROJECT. <br /> B. Preparing bid and construction contract documents. <br /> C. Preparing environmental assessment or environmental impact statements, and <br /> otherwise complying with the Federal National Environmental Policy Act. <br /> D. Complying with all federal, state, and local regulatory requirements, including the <br /> obtaining of all required permits. <br /> E. Fish and wildlife mitigation measures required by federal, state, or local laws and <br /> regulations. <br /> F. Actual construction as called for in the design documents and in change orders <br /> approved by the CWCB and the BORROWER. <br /> G. Engineering services for construction management, including design and <br /> construction management for CWCB approved change orders. <br /> H. Interest during completion of the PROJECT pursuant to Paragraph A.5 of the <br /> CONTRACT. <br /> I. Legal services for reviewing engineering services contracts, reviewing this CONTRACT, <br /> reviewing construction contract documents, and for complying with all federal, state, <br /> and local regulatory requirements. <br /> J. PROJECT-related expenses incurred prior to the Effective Date of this CONTRACT in <br /> accordance with the approval of this loan. <br /> Appendix i <br /> Page 3 of 4 <br />