My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2017-3188 Contract
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2017-3188 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2017 1:08:51 PM
Creation date
2/23/2017 12:40:28 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2017-3188
Contractor Name
Chilcott Ditch Company
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT SUMMARY— CHILCOTT DITCH COMPANY <br /> LOAN CONTRACT No. CT2017-3188 <br /> SECTION i-BORROWER INFORMATION <br /> Name: Chilcott Ditch Company <br /> Type of Entity: a mutual ditch Company and Colorado nonprofit <br /> corporation <br /> Address: 1845 Woodmoor Drive, Monument, CO 80132 <br /> Contact: Jessie Shaffer, Manager <br /> Phone Number: 719-488-2525 <br /> E-mail address: JessieS@WoodmoorWater.com <br /> SECTION 2-PROJECT DESCRIPTION <br /> A. Description of PROJECT: The BORROWER applied to the CWCB for a loan to be used <br /> for the Jimmy Camp Creek Siphon Reconstruction (PROJECT), located in El Paso <br /> County, at a total estimated project cost of$575,000.00. The purpose of the PROJECT <br /> is to replace the existing siphon that has reached the end of its service life. <br /> B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report, <br /> on the PROJECT, dated December 2o16 titled "Feasibility of Reconstruction for the <br /> Chilcott Ditch Jimmy Creek Siphon"which was prepared by John Schwab, P.E. of JPS <br /> Engineering, and is incorporated herein by this reference. Based upon the feasibility <br /> report,the CWCB determined the PROJECT to be technically and financially feasible. <br /> SECTION 3-CWCB's AUTHORITY <br /> Construction Fund: This loan is made pursuant to the provisions of§§37-6o-u9 and <br /> 37-60-120, C.R.S., which authorizes the CWCB to loan money for water projects from <br /> the CWCB Construction Fund for the benefit of the people of the state, provided that <br /> the BORROWER assures repayment of that money. <br /> Section 37-6o-122(1)(b) C.R.S., authorizes the CWCB to make loans of up to <br /> $1o,000,000 from the CWCB's Construction Fund without prior approval from the <br /> General Assembly. <br /> SECTION 4-BOARD APPROVAL <br /> At its January 23, 2o16 meeting the CWCB approved a Project Loan from the <br /> Construction Fund,to the BORROWER, in an amount up to 575,000.00 for PROTECT <br /> Costs. CWCB's LOAN ORIGINATION FEE of 1%in the amount of$5,750.00, in accordance <br /> with CWCB Policy No.16, added to the BASE LOAN AMOUNT results in a TOTAL LOAN <br /> AMOUNT of$58o,75o.00,at an interest rate of 2.20%per annum for a repayment term <br /> Of 20 years. <br /> SECTION 5-SCHEDULE OF EXISTING DEBT <br /> As of the date of the CWCB loan approval,the BORROWER has an existing loan with <br /> the Colorado Water Conservation Board, Contract No. mo15-170(C150029),with a <br /> Appendix i <br /> Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.