My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-166 Contract Amend 1
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2015-166 Contract Amend 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2018 3:03:05 PM
Creation date
2/14/2017 3:55:16 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-166
Contractor Name
San Luis Valley Water Conservancy District
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SAMPLE OPTION LETTER <br /> (TO BE SIGNED,IF APPLICABLE,ONLY UPON SUBSTANTIAL COMPELTION OF PROJECT) <br /> Date: Original Contract:CT Option Letter CMS Routing No. Borrower: <br /> No. <br /> i) OPTIONS: <br /> a.Decrease contract value(herein referred to as("Total Loan Amount"). <br /> 2) REQUIRED PROVISION.All Option Letters shall contain the appropriate provisions set forth below: <br /> For use with all Options la: <br /> i. The amount of the current Loan Contract Amount is decreased by($amount of change)to a new <br /> Total Loan Amount of($New Total Amount),in consideration of Substantial Completion of the <br /> Project.The Total Loan Amount is hereby modified accordingly.The revised Total Loan Amount <br /> including all previous amendments,option letters,etc.is(insert new$amount). <br /> 2. This change does not include a change to the annual payment and interest rate. <br /> 3. This Option Letter and supporting documentation shall become part of and be incorporated into this <br /> Contract for the total duration of this Contract. <br /> 4. This Option Letter shall include the written Notice of Project Substantial Completion. <br /> 3) Effective Date.The effective date of this Option Letter is upon approval of the State Controller or <br /> Delegate. <br /> STATE OF COLORADO <br /> John W.Hickenlooper,Governor <br /> Department of Natural Resources <br /> Colorado Water Conservation Board <br /> By: <br /> Title: <br /> Date: <br /> ALL CONTRACTS REQUIRE APPROVAL BY THE STATE CONTROLLER <br /> CRS§24-3o-2o2 requires the State Controller to approve all State contracts.This Option Letter is not valid <br /> until signed and dated below by the State Controller or delegate.Contractor is not authorized to begin <br /> performance until such time.If Contractor begins performing prior thereto,the State of Colorado is not <br /> obligated to pay Contractor for such performance or for any goods and/or services provided hereunder. <br /> STATE CONTROLLER <br /> Robert Jams,CPA,MBA,JD <br /> By: <br /> Name: <br /> Title: <br /> Date: <br /> Appendix C <br /> Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.