My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-009 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2015-009 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2017 8:40:26 AM
Creation date
2/9/2017 8:40:25 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-009
C150383
Contractor Name
Green Ditch Company
Contract Type
Loan
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
* �4 , COLORADO Emergency Green Ditch Channel Repair <br /> CO Colorado Water <br /> Conservation Board Green Ditch Company <br /> Project Closeout March 1, 2017 <br /> .,, <br /> • <br /> n w° ; <br /> . ., ..,..,..... , , ..,, ,_ ,„ _ ..zi. 7, , 10_, _ <br /> -\,,k rt:, . . , , ,... _ ... .„...„ :,„fn, , . ... x ,tvit,, <br /> \ \i,1\ ift, <br /> x, <br /> . * 1:410 I <br /> ., .. ., <br /> r‘ .,,._ __,... „..1. 111..k.r... ..„„-ammir ar i . ,.1.% , <br /> Project Description <br /> During the unprecedented flood of September 2013 in the tributaries to the South Platte River, a <br /> significant number of diversion structures and dams along the river corridor were damaged including <br /> the Green Ditch. The flood relocated Boulder Creek upstream of the Green Ditch diversion thereby <br /> leaving the Green Ditch headgate dry. The project included repairing the Boulder Creek channel breach <br /> with compacted embankment material and riprap erosion control. Boulder Creek currently flows in its <br /> pre-flood flowline alignment over the Green Ditch diversion structure. The Company analyzed a plan to <br /> relocate the diversion structure but has since decided to instead focus on fully restoring and improving the <br /> structure at its historic location. Work continues on this front but emergency loan funds will not be needed <br /> to complete the task. <br /> PROJECT DATA <br /> Sponsor: Green Ditch Company County: Boulder Water Source: Boulder Creek <br /> Type of Loan: Ditch Rehabilitation Board Approval Date: November 2013 <br /> Terms of Loan: (Original) $530,250 at 2.50% for 30 years (Disbursed) $189,199.50 <br /> Design Engineer: Applegate Group <br /> Contractor: Lefthand Excavating <br /> Project Elements: Headgate, sand gate, measurement flume rehabilitation, ditch reshaping, debris <br /> and silt removal. <br /> Water Project Loan Program - Project Summary <br />
The URL can be used to link to this page
Your browser does not support the video tag.