My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150390 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
C150390 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2017 10:36:30 AM
Creation date
2/8/2017 3:13:50 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150390
CT20173944
Contractor Name
Culver Lateral Ditch Company
Contract Type
Loan
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
* oNR COLORADO Emergency Culver Mahoney Ditch Repair <br /> CoN Colorado Water <br /> .� Conservation Board Culver Lateral Ditch Company <br /> "...,. - Project Closeout March 1, 2017 <br /> ' tip .. ` \ ` rtA . ' <br /> , n <br /> v3 - <br /> Ilk <br /> -iisii t A Rin 4 <br /> Phu' w`+� <br /> a . <br /> r <br /> _,_.cY,t,:.='`'.• ..c. C =-_'�1. .... -:�...,-,__ - - rte,. A 1 <br /> F _ , <br /> Art »I <br /> a -" <br /> -AP S <br /> -,'"'°---- . i .. , , <br /> -, g g - <br /> Project Description <br /> During the unprecedented flood of September 2013 in the tributaries to the South Platte River, a <br /> significant number of diversion structures and dams along the river corridor were damaged including <br /> the Culver Lateral Ditch Company ditch and diversion structure. The flood damaged the diversion dam, <br /> headgate structure, sand gates, measurement flume, and recording structure. Additionally, the first <br /> 1,500 feet of ditch was destroyed as it effectively became a part of the Little Thompson River. The <br /> next 1,800 feet of ditch was filled with sediment. The project included removal of debris and silt from <br /> the ditch and diversion dam, reshaping the ditch sideslopes and flowline, and rehabilitation of the <br /> headgate structure, sand gates, measurement flume, and recording structure. <br /> PROJECT DATA <br /> Sponsor: Culver Lateral Ditch County: Boulder/Larimer Water Source: Little Thompson <br /> Company River <br /> Type of Loan: Diversion Rehabilitation Board Approval Date: December 2013 <br /> Terms of Loan: $151,500 at 2.30% for 30 years (Disbursed) $151,500 <br /> Design Engineer: TZA Water Engineers <br /> Contractor: Chaparral Construction <br /> Project Elements: Headgate, sand gate, measurement flume rehabilitation, ditch reshaping, debris <br /> and silt removal. <br /> Water Project Loan Program - Project Summary <br />
The URL can be used to link to this page
Your browser does not support the video tag.