My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2017-2253 Contract
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2017-2253 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2017 12:08:31 PM
Creation date
2/1/2017 12:08:27 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2017-2253
Contractor Name
Larimer and Weld Irrigation Company
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT SUMMARY - LARIMER AND WELD IRRIGATION COMPANY, <br /> A COLORADO NONPROFIT CORPORATION <br /> LOAN CONTRACT No. CT2o17-2253 <br /> SECTION 1-BORROWER INFORMATION <br /> Name: Larimer and Weld Irrigation Company <br /> Type of Entity: A Colorado nonprofit corporation <br /> Address: 106 Elm Avenue, Eaton, Colorado 80615 <br /> Contact: Mayo Sommermeyer,Attorney <br /> Phone Number: 97o-420-9775 <br /> E-mail address: mayosomm@gmail.com <br /> SECTION 2-PROJECT DESCRIPTION <br /> A. Description of PROJECT: The BORROWER applied to the CWCB for a loan to be used <br /> for the Headgate Structure Replacement (PROJECT), located in Larimer County, at a <br /> total estimated project cost of$750,000.00. The Company's diversion structure off the <br /> Cache la Poudre River is aging and in need of repair. The PROJECT will replace the <br /> headgate structure, including the concrete structure, gates, gate operators, and a new <br /> control building. <br /> B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report, <br /> on the PROJECT, dated July 10, 2016 titled "Feasibility Study for Rehabilitation of Larimer <br /> & Weld Irrigation Company Canal Diversion on the Cache la Poudre River,"which was <br /> prepared by Brad Anderson, P.E. of Anderson Consulting Engineers, and is <br /> incorporated herein by this reference. Based upon the feasibility report, the CWCB <br /> determined the PROJECT to be technically and financially feasible. <br /> SECTION 3-CWCB's AUTHORITY <br /> Construction Fund: This loan is made pursuant to the provisions of§§37-60-119 and <br /> 37-60-120, C.R.S., which authorizes the CWCB to loan money for water projects from <br /> the CWCB Construction Fund for the benefit of the people of the state, provided that <br /> the BORROWER assures repayment of that money. <br /> Section 37-6o-122(1)(b) C.R.S., authorizes the CWCB to make loans of up to <br /> $10,000,000 from the CWCB's Construction Fund without prior approval from the <br /> General Assembly. <br /> SECTION 4-BOARD APPROVAL <br /> At its September 21, 2016 meeting the CWCB approved a Project Loan from the <br /> Construction Fund to the BORROWER, in an amount up to $675,000.00 for PROJECT <br /> Costs. CWCB's LOAN ORIGINATION FEE of 1%in the amount of$6,750.00, in accordance <br /> with CWCB Policy No. 16, added to the BASE LOAN AMOUNT results in a TOTAL LOAN <br /> AMOUNT of$681,75o.00, at an interest rate of 1.50%per annum for a repayment term <br /> of 3o years. <br /> Appendix <br /> Page 1 of 4 <br />