My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2017-2253 Contract
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2017-2253 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2017 12:08:31 PM
Creation date
2/1/2017 12:08:27 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2017-2253
Contractor Name
Larimer and Weld Irrigation Company
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BORROWER: LARIMER AND WELD AGENCY NAME: COLORADO WATER <br /> IRRIGATION COMPANY CONSERVATION BOARD <br /> BASE LOAN AMOUNT:$675,000.00 CONTRACT TYPE:LOAN/PRIVATE <br /> LOAN ORIGINATION FEE:$6,750.00 CWCB CMS:93929/CORE: CT2o17-2253 <br /> TOTAL LOAN AMOUNT:$681,750.00 <br /> LOAN CONTRACT <br /> This contract ("CONTRACT" or "LOAN CONTRACT") is made between the State of <br /> Colorado for the use and benefit of The Department of Natural Resources, Colorado Water <br /> Conservation Board, 1313 Sherman Street, Denver, CO, 80203, ("CWCB" or "State"), and <br /> Larimer and Weld Irrigation Company, 1o6 Elm Avenue, Eaton, Colorado 80615, a <br /> Colorado nonprofit corporation, (`BoRRowER"). <br /> FACTUAL RECITALS <br /> 1. CWCB authority exists in the law, and funds have been budgeted, appropriated and <br /> otherwise made available and a sufficient unencumbered balance thereof remains <br /> available for encumbering and subsequent payment of this CONTRACT;and <br /> 2. Required approval, clearance, and coordination have been accomplished from and with <br /> appropriate agencies;and <br /> 3. On September 21, 2016, the CWCB approved a loan request from the BORROWER for the <br /> Headgate Structure Replacement ("PRoJECT").The Company's diversion structure off the <br /> Cache la Poudre River is aging and in need of repair. The PROJECT will replace the <br /> headgate structure, including the concrete structure, gates, gate operators, and a new <br /> control building.The total estimated Project Cost is $750,000.00. The total loan amount <br /> ("TOTAL LOAN AMOUNT") of $681,750.00 which includes a one percent (1%) loan <br /> origination fee of 6,75o.00 is payable over 3o years at an interest rate of 1.50%;and <br /> 4. The PROJECT SUMMARY, attached as APPENDIX 1, and incorporated herein contains <br /> BORROWER Information (Section 1), the PROJECT Description (Section 2), CWCB's <br /> authority for making this loan (Section 3), and CWCB Approval or Legislative <br /> Authorization (Section 4), identifying the amount of the loan and the terms of <br /> repayment. The PROJECT SUMMARY also contains sections on the BORROWER'S existing <br /> debt, contract requirements, procedures, eligible expenses, disbursement schedule and <br /> time for performance. <br /> 5. The CWCB now desires, by this CONTRACT, to loan money to the BORROWER for this <br /> PROJECT upon mutually agreeable terms and conditions. <br /> THEREFORE, in consideration of the mutual and dependent covenants contained <br /> herein, the parties agree as follows: <br /> Page 1 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.