Laserfiche WebLink
SPWRAP <br /> PRRIP at a Glance (October, 2016) <br /> Vlilestones 1-3 State Water Pro "ects Goal: Provide 80ka o Water <br /> • Environmental Acct. in Lake McConaughy OPERATIONAL <br /> • Tamarack 1 OPERATIONAL <br /> • Pathfinder Modification Project OPERATIONAL <br /> Milestone 4 Water Action Plan Goal: Provide 50-70kaf of Water <br /> • Identified feasible projects to achieve Goal <br /> J-2 Reservoir 26,300 af/yr <br /> o Surface H2O leases 8,000 to 12,000 af/yr 9700 af to date <br /> o Recharge leases up to 10,000 af/yr 7420 af to date <br /> �l1 / (1Y I12I dl;;t:! 01/ (Ji'Ll'r)/ (lif )' ( <br /> p ] ) f j lir r <br /> L 0(1�i �VC(1l � /'i-,����j�y�J SJ.. ,:' ria .l,L1111��%,) '(�e <br /> 7111r"111 <br /> , . yes.- r,. ..-...x ,. . ....,,.,.- <br /> rilestone 5 Land Plan Goal: 101000 acres of habitat <br /> • 12,023 acres of land controlled or contracted (avg. cost: $1930/ac) <br /> • land activity focused on restructuring for habitat needs, (need 154 <br /> acres of non-complex habitat to reach sub-goal of 800 acres: Sac of <br /> off channel sand/Water and 146ac of palustrine wetlands) <br />