My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2017-2875 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2017-2875 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2017 12:08:28 PM
Creation date
11/18/2016 11:23:55 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2017-2875
Contractor Name
Grand Valley Water Users Association
Contract Type
Loan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DNR COLORADO 1313 Sherman Street John Hickenlooper, Governor <br /> Co Colorado Water Denver, CO 80203 <br /> Robert Randall, DNR Executive Director <br /> Conservation Board P (303) 866-3441 <br /> Department of Natural Resources F(303) 866-4474 James Eklund, CWCB Director <br /> TO: Colorado Water Conservation Board Members <br /> FROM: Jonathan Hernandez, P.E., Project Manager <br /> Kirk Russell, P.E., Finance Section Chief \i,C1 — <br /> DATE: November 16-17, 2016 Board Meeting (Updated November 17, 2016) <br /> AGENDA ITEM: 14c. Water Project Loans <br /> Grand Valley Water Users Association - Grand Valley Power Plant Rehabilitation <br /> Introduction <br /> The Grand Valley Water Users Association (Association) is applying for a loan for the Grand Valley <br /> Power Plant Rehabilitation (Project). The Association is working with the Orchard Mesa Irrigation <br /> District (District) to complete this Project. The goal of the Project is to bring the Grand Valley Power <br /> Plant (GVPP) up to a sustainable operating condition and meet current electric and safety standards. <br /> Preliminary designs show the rehabilitation could increase the maximum power generation output from <br /> 2.75 MW to 4.1 MW. The Association is requesting a loan from the CWCB for approximately 92% of its <br /> share of Project cost. The District is concurrently seeking a CWCB loan to help cover its share of <br /> Project cost (see November 2016 Agenda Item 14b). Combined, these two CWCB loans would cover <br /> approximately 65% of the total Project cost. See attached Project Data Sheet for a location map and <br /> Project summary. <br /> Staff Recommendation (Board approved Staff Recommendation on November 17, 2016) <br /> Staff recommends the Board approve a loan not to exceed $1,717,000 ($1,700,000 for Project costs and <br /> $17,000 for the 1% service fee) to the Grand Valley Water Users Association, for costs related to the <br /> Grand Valley Power Plant Rehabilitation Project, from the Construction Fund. The loan terms shall be <br /> 30 years at the hydroelectric interest rate of 2.0% per annum. Security for the loan shall be in <br /> compliance with CWCB Financial Policy#5. <br /> 6y,c24, <br /> 4,:<<; <br /> Interstate Compact Compliance •Watershed Protection • Flood Planning Et Mitigation • Stream Et Lake Protection se c <br /> Water Project Loans Et Grants •Water Modeling • Conservation Et Drought Planning •Water Supply Planning <br /> /876.* <br />
The URL can be used to link to this page
Your browser does not support the video tag.