Laserfiche WebLink
Town of Firestone Agenda Item 14a <br /> November 16-17, 2016 Board Meeting (Updated November 17, 2016) <br /> Page 3 of 5 <br /> Water Rights <br /> The only water rights owned by the Town are 5,103 shares of C-BT water. The Town has a current <br /> irrigation demand of approximately 442 acre-feet, which is expected to increase to nearly 988 acre- <br /> feet based on the Town's Non-Potable Water Rights Master Plan. The Towns potable water demand is <br /> presently 2,000 to 2,100 acre-feet annually. <br /> Project Description <br /> The purpose of this Project is to construct a water storage project to help meet the Town's current and <br /> future water needs. The seniority of water rights factors largely into the amount of non-potable <br /> storage needed to meet this demand. For junior water rights, three to five times the demand may be <br /> the storage volume needed to provide reliability for irrigation. Senior water rights may only need 1.5 to <br /> two times the demand. For long-range planning purposes, the Town will pursue 2,000 acre-feet of <br /> storage. <br /> The Town analyzed multiple alternatives to obtain water storage and associated water rights. This loan <br /> will provide funds to acquire 1,092 acre-feet of storage. <br /> Storage Alternative 1 - No-Action: The no-action alternate was not selected as the Town would <br /> remain solely dependent upon its ownership of 5,103 units of C-BT for its irrigation supply. While this <br /> would be the least expensive alternate, the Town would still need to address its outstanding supply <br /> issues in the future at greater cost and more limited availability, as other entities near the Town <br /> actively pursue their own storage facilities and supplies. <br /> Storage Alternative 2 - Central Park Storage: This alternate proposes on-site storage in the Town's <br /> future Central Park. Advantages to this location include its central location in a critical area for non- <br /> potable storage, proximity to a large irrigation demand, and use of the storage as a park amenity. <br /> Disadvantages include a fluctuating water surface in a public lake amenity, distance to river for <br /> augmentation purposes, and distance from the St. Vrain Sanitation Wastewater Treatment Plant, which <br /> in the future will be generating fully consumable wastewater. Project cost for this alternate was <br /> estimated to be $10,300 per acre-foot. This alternate is high compared to the others because it would <br /> need to be excavated from scratch, and there would be no gravel sales to offset the cost of the <br /> facility. <br /> Storage Alternative 3 - Hokestra Pit Storage - Cells 2 and 4: This alternate proposes storage in the <br /> Hokestra Pit, which is currently owned and operated by Weld County for gravel mining operations, and <br /> consists of twelve cells. Among the advantages of this location are that Cell 2 is completed and lined, <br /> Cell 4 is unmined but lined, proximity to the St. Vrain River, possible future use for water rights <br /> storage drawn from the river, and good storage volumes. Disadvantages include the fact that the site <br /> fails to fully meet the Town's storage needs by approximately 1,400 acre-feet, it is not an ideal <br /> location to take advantage of future effluent reuse, and the cost was higher than the other <br /> alternatives. Project cost for this alternate was estimated to be $4,200 per acre-foot. <br /> Selected Storage Alternative 4 - Carbon Valley Resource Pit: This alternate provides a single <br /> storage reservoir at the Carbon Valley Pit, currently owned and operated by LG Everist, Inc. for gravel <br /> mining operations. Upon completion of mining operations, the resulting volume of the proposed Carbon <br /> Valley Pit is estimated to be approximately 1,092 acre-feet. Advantages of this location include <br /> proximity to the St. Vrain River, strategic location for future augmentation obligations, good storage <br /> volume, future expansion possibility as LG Everist, Inc. will be mining the property adjacent to the <br /> west, storage on the river opens up more water rights that can be purchased and used, infrastructure <br /> for this location is right next to the St. Vrain Sanitation Waste Water Treatment Plant for access to <br />