My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-132 Substantial Completion Letter
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2015-132 Substantial Completion Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2016 10:55:45 AM
Creation date
10/25/2016 10:55:43 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-132
C150394
Contractor Name
Farmers Pawnee Canal Company
Contract Type
Loan
County
Logan
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DNR COLORADO <br /> CO Colorado Water <br /> Conservation Board <br /> Department of Natural Resources <br /> 1313 Sherman Street, Room 718 <br /> Denver, CO 80203 <br /> October 25, 2016 <br /> Mr. Steve Wagner, President <br /> Farmers Pawnee Canal Company <br /> 18123 County Road 34 <br /> Sterling, CO 88751 <br /> Re: Diversion Structure Replacement Project <br /> Loan Contract Number CT2015-132 (C150394) <br /> NOTICE OF PROJECT SUBSTANTIAL COMPLETION <br /> Dear Mr. Wagner: <br /> This letter is to advise you that the Project referenced above was substantially completed on <br /> September 1, 2016. In accordance with the Loan Contract, the Company owes $53,896.29 for interest <br /> accrued during the construction phase of the Project (see attached Project Expenditure Schedule). <br /> Please make this "interest only payment" check payable to the Colorado Water Conservation Board and <br /> include the Loan Contract Number CT2015-132 on the check. <br /> The total amount disbursed under this contract was $2,067,470.00 ($2,047,000.00 plus $20,470.00 for <br /> the 1% service fee). The first annual loan payment will be due on September 1, 2017, in the amount of <br /> $89,169.47 as presented in the attached Loan Repayment Schedule and Promissory Note. <br /> Please note, in accordance with the Borrower's Liability Insurance Provision of the Loan Contract, a <br /> renewed insurance certificate must be submitted to the CWCB annually and a Reserve Account must be <br /> maintained during the entire repayment period. <br /> It has been a pleasure working with you on the successful completion of this project. Please don't <br /> hesitate to call if you have any questions regarding this matter. <br /> Sincerely, <br /> Kirk Russell, P.E. Chief Loan Contract Amount = $2,067,470.00 <br /> CWCB Finance Section Expended Amount = $2,067,470.00 <br /> cc: Jim Yahn, CWCB Board Member, South Platte River Basin <br /> P 303.866.3441 F 303.866.4474 www.cwcb.state.co.us <br /> John W. Hickenlooper, Governor I Robert Randall, DNR Executive Director I James Eklund, CWCB Director <br /> * 1876*,,. <br />
The URL can be used to link to this page
Your browser does not support the video tag.