My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Silt Pumping Plant Rehabilitation Preliminary Design
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
Silt Pumping Plant Rehabilitation Preliminary Design
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2017 1:35:55 PM
Creation date
10/13/2016 10:15:52 AM
Metadata
Fields
Template:
Water Supply Protection
Description
Related to CRSP MOA
State
CO
Basin
Statewide
Water Division
5
Date
1/1/2014
Author
US Department of the Interior
Title
Silt Pumping Plant Rehabilitation Preliminary Design
Water Supply Pro - Doc Type
Budget
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Preliminary Design Memorandum <br /> Silt Pumping Plant Rehabilitation <br /> discharge valves could be another source of vacuum leaks. The valve seats, seals and stem <br /> packing should be inspected for excessive wear. <br /> Alternatives Considered: <br /> • Gravity fill from common storage tank <br /> • Self-priming pumps <br /> • Dual (suction and discharge) interconnected priming tanks for each pump <br /> • Vacuum priming system <br /> Description <br /> 13 <br /> FOR OFFICIAL USE ONLY <br />
The URL can be used to link to this page
Your browser does not support the video tag.