My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Proposal for Pilot Evaporation Pond
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
Proposal for Pilot Evaporation Pond
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2016 10:15:47 AM
Creation date
10/13/2016 10:15:45 AM
Metadata
Fields
Template:
Water Supply Protection
Description
Related to CRSP MOA
State
CO
Basin
Statewide
Author
Paradox Valley Unit
Title
Proposal for Pilot Evaporation Pond
Water Supply Pro - Doc Type
Budget
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Paradox Valley Unit <br /> Proposal for Evaporation Pond <br /> Some of the many benefits of the proposed pilot evaporation pond include: <br /> 1. Observe Effect on Wildlife—The North American Migration Flyways <br /> map indicates that the Unit borders the west edge of the Central Flyway <br /> for migratory birds. The majority of migratory bird traffic in the region <br /> may occur further to the east as suggested by the map. Observations at the <br /> test pond would provide information about the frequency and duration of <br /> pond use by migratory birds that may pass through the area. Since the <br /> pond would be located close to the river,perhaps few birds would visit, <br /> and the duration of a stay may be less than it would otherwise be. The <br /> impact of a larger scale, long-term evaporation pond project on birds <br /> would be more accurately assessed based on information the pilot pond <br /> would provide. <br /> 2. Gather Air Quality Data—Tests would be performed to evaluate air <br /> quality at the evaporation pond. The data would be analyzed to better <br /> understand the extent of brine processing or filtration(e.g., stripping <br /> facility)that would need to be implemented to safely operate a compliant <br /> full-scale evaporation pond project. <br /> 3. Observe Actual Salt Disposal Rates—Many factors contribute to actual <br /> performance characteristics of evaporation ponds. The test pond would <br /> provide an opportunity to gather helpful data about evaporation rates <br /> specific to the project's ambient climate,topography, brine characteristics, <br /> etc. Information gathered from the test pond would be valuable in <br /> evaluating the feasibility of larger scale permanent operations and aid in <br /> their design and development. Tests could also be performed to evaluate <br /> possible winter evaporation with new technology to increase disposal <br /> rates. <br /> 4. Estimate Cost-Effectiveness of Evaporation Disposal Method—Upfront <br /> capital and maintenance costs are estimated to be significantly less for <br /> evaporation ponds than for deep well injection. The test pond will provide <br /> information to more accurately estimate the cost-effectiveness of disposal <br /> using evaporation as compared to other methods. <br /> 5. Capture More Salt—Preliminary calculations estimate that the test <br /> evaporation pond described above would dispose of approximately 18,000 <br /> tons of salt annually. This represents effective disposal of almost 80%of <br /> the salt loading that has been entering the Dolores River during the two <br /> twenty day periods when the injection well is shut down each year. The <br /> test evaporation pond and injection well would combine to capture a <br /> considerably higher percentage of the total salt loading at Paradox than <br /> what is removed by the injection well alone. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.