My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BLM Extention Letter
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
BLM Extention Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2017 4:28:28 PM
Creation date
10/12/2016 3:42:27 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Documents related to the Upper Colorado River Wild and Sceni Stakeholders Process
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/21/2009
Author
BLM
Title
BLM Extention Letter
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The following will be addressed during 6-to-8 month period prior to completion of DEIS: <br /> 1. Agreement on criteria for data collection to quantify the ORV Indicators. <br /> 2. Refinement of the "placeholder" Provisional Resource Guides, including <br /> any refinement of the Provisional Flow Guide ranges and <br /> establishment of the Provisional WQ, Temperature, and other <br /> Resource Guides. <br /> 3. Agreement on provisional standards for identifying a "significant risk of <br /> impairment" to the ORV Indicators. <br /> 4. Monitoring Plan — Details of Section V of Outline. <br /> 5. Description of the process that will be followed for any adjustment of the <br /> Provisional ORV Indicators and Provisional Resource Guides during <br /> the 3-5 year study period, and periodically thereafter (when, by what <br /> standard, and by who?). <br /> 6. Agreement on SG Governance protocol for addressing Changed <br /> Circumstances (how the SG will determine that a material change in <br /> circumstances exists, how to address it, and under what <br /> circumstances it will be elevated to BLM). <br /> 7. All matters related to Governance — Details of Section VI of Outline. <br /> 8. Additional issues or concerns identified by BLM. <br /> Attachment A— Description of Tier 1 Long Term Protection Measures. <br /> Attachment B — Milestones for implementation of Tier 1 Long Term Protection <br /> Measures and Mechanisms for addressing Changed Circumstances. <br /> Attachment C — Figures 1, 2, and 3. <br /> Page 16 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.