My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BLM Extention Letter
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
BLM Extention Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2017 4:28:28 PM
Creation date
10/12/2016 3:42:27 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Documents related to the Upper Colorado River Wild and Sceni Stakeholders Process
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/21/2009
Author
BLM
Title
BLM Extention Letter
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Tier 1 Implementation of Lona-Term Measures. These measures, <br /> described in Section IV.b below and Attachment A to this Plan, are <br /> supported by the Stakeholder Group and will be pursued pursuant <br /> to identified Milestones in Attachment B to this Plan. <br /> Tier 2 Implementation of additional Cooperative Measures. These will <br /> complement the Tier 1 measures. These may serve to maintain or <br /> enhance the ORVs, assist in achieving Provisional or Refined <br /> Resource Guides, and/or address Changed Circumstances. <br /> Section IV.c of this Plan mandates a specific process to ensure <br /> timely and periodic consideration of data pertaining to the ORV <br /> Indicators and Resource Guides and to assess the need and <br /> available opportunities for implementing additional measures. <br /> Tier 3 SG Elevation Process. This Plan incorporates an elevation process <br /> to the full Stakeholder Group for purposes of addressing <br /> unresolved concerns of SG members material to implementation of <br /> the Plan or the status of the Provisional or Refined Resource <br /> Guides or ORV Indicators. That elevation process is summarized <br /> in Section IV.d below. <br /> Tier 4 Elevation to BLM. The Plan specifies an elevation process to BLM <br /> as may be warranted in the event material unresolved concerns <br /> arise under the Plan as set forth in Section IV.e that are not being <br /> addressed by adaptive management responses under the Plan. <br /> b. Tier 1 Long-Term Protection Measures <br /> These are measures that are expected to result in ongoing protection of <br /> the ORVs, unless a material change in circumstances occurs. <br /> The long-term protective measures are summarized below. Additional <br /> detail on the long-term protective measures is provided in Attachment A. <br /> The long-term protective measures will be pursued in accordance with the <br /> Milestones in Attachment B. <br /> i. Appropriation of CWCB instream flow (ISF) right: The Stakeholder <br /> Group has expressed support for a CWCB ISF right or water rights <br /> for base flows in the subject stream segments. An ISF water right <br /> can protect stream flows between two points on a stream from <br /> future water rights appropriations in accordance with the State's <br /> prior appropriation system. ISF water rights are held exclusively by <br /> the CWCB for minimum stream flows to preserve the natural <br /> Page 8 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.