Laserfiche WebLink
facility modifications and any required mitigation for the reallocation of storage <br />space in the Chatfield Project. <br />1.10. The Colorado General Assembly provided the CWCB the authority and <br />ability to hold storage space in the Chatfield Project and to contract with, and <br />allocate storage to, local entities who will utilize the reservoir storage space among <br />other powers and duties established in section 37-60-120.1, C.R.S. Over time, the <br />Colorado General Assembly has appropriated approximately $62 million for the <br />CWCB to retain Orphan Shares in the Reallocation Project. <br />1.11. The implementation costs for the Reallocation Project are 100% non- <br />federal. The current estimate of all project implementation costs is approximately <br />$134,000,000 ("Total Project Costs"). <br />1.12. The non-Federal sponsor, CDNR, is responsible for construction and <br />operational costs associated with the Reallocation Project. The Colorado Division of <br />Parks and Wildlife currently operates and manages Chatfield State Park and <br />associated facilities around the reservoir. The Water Providers, working <br />collaboratively with the CDNR, will bear all costs of the mitigation and <br />modiiication, and will take the lead role in design and construction. The <br />Government's involvement in these efforts will be limited to oversight, review, and <br />approval. <br />1.13. The annual Operation, Maintenance, Repair, Rehabilitation, <br />Reconstruction and Replacement (O&M-RRR&R) payments for the project are <br />based on estimates by the Government for a present worth total amount of <br />$59,262,600 for the full 20,600 acre-feet over the 50 year Reallocation Project life. A <br />portion of the payments will go to the U.S. Treasury for normal operations based on <br />the Reallocation Project storage space calculated as 8.99% of the total storage space <br />available in Chatfield Reservoir. Other portions will be directed to a separate <br />escrow account, managed by the State and the Water Providers, for maintaining the <br />environmental mitigation work and recreation infrastructure related to the <br />Reallocation Project. O&M-RRR&R payments will be evaluated and adjusted every <br />five years based on actual need and expenditures. <br />1.14. Purchaser has relinquished a total of 1,300.339 acre-feet in the <br />Reallocation Project to the CWCB pursuant to paragraph 5.a of the Letter of <br />Commitment. Purchaser relinquished 913.158 acre-feet held in its own name and <br />387.181 acre-feet held by the South Metro Water Supply Authority, of which <br />Purchaser is a member. Purchaser retained 200 acre-feet in the Reallocation <br />Project. <br />1.15. Purchaser wishes to acquire long term future storage for its renewable <br />water supplies. <br />Page 3 of 13 <br />