Laserfiche WebLink
'T‘ DNR COLORADO Government Highline Canal Lining <br /> CO I= <br /> Colorado Water <br /> Conservation Board Grand ValleyWater Users Association <br /> September 2016 Board Meeting <br /> LOAN DETAILS I <br /> Project Cost: $800,000 <br /> CWCB Loan (with Service Fee): $151,500 eiri6 'rf ' <br /> Loan Term and Interest Rate: 30 Years ® 1.55% <br /> Funding Source: Construction Fund A.. 10 \ <br /> BORROWER TYPE ,,�� ..., 1111e <br /> Agriculture Municipal Commercial 41 <br /> 90% 0% Low - 10%Mid - 0% High 0% <br /> PROJECT DETAILS <br /> Project Type: Ditch Rehabilitation r 1 <br /> '"' - '410il <br /> Average Annual Delivery: 260,000 AF <br /> The Grand Valley Water Users Association (Association), is L 0 C A TI 0 N <br /> requesting funding for the Government Highline Canal Lining County: Mesa <br /> Project. The Association is the managing entity of the Bureau of Water Source: Colorado River <br /> Reclamation's Grand Valley Project. The Grand Valley Project Drainage Basin: Colorado <br /> facilities include the Grand Valley Diversion Dam (also known as Division: 5 District: 72 <br /> the Roller Dam) on the Colorado River in De Beque Canyon, the <br /> 55-mile-long Government Highline Canal,150 miles of project operated laterals, 100 miles of drainage ditches, and <br /> a hydroelectric power plant. The embankment immediately below the Roller Dam is relatively narrow and <br /> separates the Government Highline Canal from the Colorado River. This section of canal was constructed around <br /> 1915. Over the last 100 years the embankment has slumped, settled and degraded. Occasional erosion within the <br /> embankment has led to material loss and sinkholes. As a result of canal degradation, water flow is restricted and <br /> the canal cross section has been reduced, causing a reduction in capacity of the canal channel. The canal is <br /> currently physically restricted to approximately 1,600 cfs while the water rights are for 1,730 cfs. To increase the <br /> capacity, the Association intends to improve first 500 feet of the canal. Permitting and final design are scheduled <br /> for completion by March 2017. Construction is anticipated in summer and fall of 2017. <br /> fakr.aA�Riv.•R..i.. <br /> . <br /> '_. <br /> !JpAer Sown baoor 12.! <br /> `••' ,•....• Row Unm dn0 canal NW/0k. <br /> isUwAlB.,.. an <br /> j <br /> ...• funnel J Ennancx --- <br /> GVPP♦OWU Siphon OA ,f.^ „ Fw. <br /> O41111, waw. <br /> .. „, _ illi <br /> - 1 ' I.nO.ra Nous. <br /> t.M PaJM aYm <br /> r cnn ra.r <br /> r 2110 I 1 <br /> uy ar <br /> ��uneam <br /> l <br /> ` , <br /> y.,,, i : p <br /> o.cn.w i°� TITION •••..1..f9 <br /> ,.. <br /> W. iCsVPr+'.!+'' --1lrvera'Gwess <br /> .. , d W-ai e,Mxe anal <br /> Is s'_ woe <br /> Water Project Loan Program - Project Data Sheet <br />