Laserfiche WebLink
A, DNR C O L O R A D O Headgate Structure Replacement <br /> CO 111 Colorado Water Larimer andCompany <br /> Weld Irrigation <br /> Conservation Board <br /> September 2016 Board Meeting <br /> LOAN .. <br /> DETAILS l -- _, <br /> Project Cost: $750,000 , _ `` <br /> CWCB Loan (with Service Fee): $681,750 -� 6 f <br /> Loan Term and Interest Rate: 30 Years ® 1.5% ItFunding Source: Construction Fund 5IF igeo, <br /> BORROWER TYPE I — <br /> Agriculture Municipal Commercial 4 ' <br /> 96% 0% Low - 4%Mid - <1% High 0% <br /> PROJECT DETAILS <br /> Project Type: Ditch Rehabilitation 7 �� <br /> ALJ <br /> Average Annual Delivery: 85,000 AF fly <br /> 1 <br /> The Larimer and Weld Irrigation Company is a Colorado L 0 C A T ION <br /> Mutual Ditch Company and a nonprofit corporation. The County: Larimer a Weld <br /> Company's service area extends from the Cache la Water Source: Cache la Poudre River <br /> Poudre River diversion north of Fort Collins, east to near Drainage Basin: South Platte <br /> the town of Galeton, encompassing approximately 61,000 Division: 1 District: 3 <br /> acres of irrigated land in Larimer and Weld Counties. The <br /> Company's diversion off the Cache la Poudre River is aging and in need of repair. This Project will focus <br /> on replacing the headgate structure, including the concrete structure, gates, and gate operators. The <br /> replacement of the trash rack and forebay structure, and repairs to the diversion structure, are <br /> planned to take place within the next few years and are not a part of this Project. <br /> The City of Fort Collins has developed a flood control plan for the Dry Creek Basin, which in part uses <br /> the Larimer It Weld Ditch as a conveyance for flood flows in Dry Creek. Therefore, should a flood occur <br /> in the Dry Creek Basin, it is of great importance for life, safety, and prevention of property damage, <br /> that the ditch's upstream headgate off the Poudre River be able to close so there is capacity available <br /> in the ditch to handle flood flows. Construction activities will include the replacement of the concrete <br /> structure, new gates and operators, and a new control building. Construction is expected to occur <br /> between the 2016 and 2017 irrigation seasons. <br /> Headgate Structure" , ',,,Irp <br /> x <br /> Project Site <br /> -V- -',..r f ; r -,„ <br /> Ft. Collins HWY 14 r -:- ' , : , `./ <br /> 't,i,,.,---4: ,' , ''le', ‘,,T, <br /> • US 287 ,,,S.,;4'1:0-,,p <br /> 1 25 k : ,41.''..'t ^fig, <br /> 411210 <br /> US 34 <br /> CLovelandp +p = <br /> - - 3 l <br /> Headgate t_= <br /> Structure i <br /> Water Project Loan Program - Project Data Sheet <br />