A, DNR C O L O R A D O Headgate Structure Replacement
<br /> CO 111 Colorado Water Larimer andCompany
<br /> Weld Irrigation
<br /> Conservation Board
<br /> September 2016 Board Meeting
<br /> LOAN ..
<br /> DETAILS l -- _,
<br /> Project Cost: $750,000 , _ ``
<br /> CWCB Loan (with Service Fee): $681,750 -� 6 f
<br /> Loan Term and Interest Rate: 30 Years ® 1.5% ItFunding Source: Construction Fund 5IF igeo,
<br /> BORROWER TYPE I —
<br /> Agriculture Municipal Commercial 4 '
<br /> 96% 0% Low - 4%Mid - <1% High 0%
<br /> PROJECT DETAILS
<br /> Project Type: Ditch Rehabilitation 7 ��
<br /> ALJ
<br /> Average Annual Delivery: 85,000 AF fly
<br /> 1
<br /> The Larimer and Weld Irrigation Company is a Colorado L 0 C A T ION
<br /> Mutual Ditch Company and a nonprofit corporation. The County: Larimer a Weld
<br /> Company's service area extends from the Cache la Water Source: Cache la Poudre River
<br /> Poudre River diversion north of Fort Collins, east to near Drainage Basin: South Platte
<br /> the town of Galeton, encompassing approximately 61,000 Division: 1 District: 3
<br /> acres of irrigated land in Larimer and Weld Counties. The
<br /> Company's diversion off the Cache la Poudre River is aging and in need of repair. This Project will focus
<br /> on replacing the headgate structure, including the concrete structure, gates, and gate operators. The
<br /> replacement of the trash rack and forebay structure, and repairs to the diversion structure, are
<br /> planned to take place within the next few years and are not a part of this Project.
<br /> The City of Fort Collins has developed a flood control plan for the Dry Creek Basin, which in part uses
<br /> the Larimer It Weld Ditch as a conveyance for flood flows in Dry Creek. Therefore, should a flood occur
<br /> in the Dry Creek Basin, it is of great importance for life, safety, and prevention of property damage,
<br /> that the ditch's upstream headgate off the Poudre River be able to close so there is capacity available
<br /> in the ditch to handle flood flows. Construction activities will include the replacement of the concrete
<br /> structure, new gates and operators, and a new control building. Construction is expected to occur
<br /> between the 2016 and 2017 irrigation seasons.
<br /> Headgate Structure" , ',,,Irp
<br /> x
<br /> Project Site
<br /> -V- -',..r f ; r -,„
<br /> Ft. Collins HWY 14 r -:- ' , : , `./
<br /> 't,i,,.,---4: ,' , ''le', ‘,,T,
<br /> • US 287 ,,,S.,;4'1:0-,,p
<br /> 1 25 k : ,41.''..'t ^fig,
<br /> 411210
<br /> US 34
<br /> CLovelandp +p =
<br /> - - 3 l
<br /> Headgate t_=
<br /> Structure i
<br /> Water Project Loan Program - Project Data Sheet
<br />
|