My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150243 PIF Documents
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
C150243 PIF Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 11:32:30 AM
Creation date
8/30/2016 11:32:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150243
Contractor Name
Aurora, City of
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROMISSORY NOTE <br /> Date: June 14, 2010 <br /> Borrower: City of Aurora, acting by and through its nt ' e <br /> Principal Amount: $75,750,000 <br /> Interest Rate: 3.75% per annum irAr Ft), <br /> Term of Repayment: 30 years <br /> Loan Contract No.: C150243, dated November 20, 2007, and amendeatiL, <br /> 2010 <br /> Loan Payment: $4,415,876.87 <br /> Payment Initiation Date*: May 1, 2010 <br /> Maturity Date*: May 1, 2040 <br /> * Payment Initiation Date and Maturity Date fields are filled in after the project has been <br /> substantially completed. <br /> 1. FOR VALUE RECEIVED, the BORROWER promises to pay the Colorado Water <br /> Conservation Board ("CWCB"), the Principal Amount plus Interest for the Term of <br /> Repayment, pursuant to the LOAN CONTRACT and this promissory note. <br /> 2. This Promissory Note replaces and supersedes the Promissory Note dated November <br /> 20, 2007, in the principal amount of$75,750,000. <br /> 3. Borrower shall pay the first two interest-only loan payments in the amount of <br /> $2,840,625.00, and thereafter principal and interest shall be payable in the Loan <br /> Payment amount. The first payment is due and payable May 1, 2011, and <br /> subsequent payments are due annually thereafter. All principal, interest, and late <br /> charges, if any, then remaining unpaid shall be due and payable on or before the <br /> Maturity Date. <br /> 4. Payments shall be made to the Colorado Water Conservation Board at 1313 Sherman <br /> Street, Room 721, Denver, Colorado 80203. <br /> 5. The CWCB may impose a late charge in the amount of 5% of the annual payment if <br /> the CWCB does not receive the annual payment within 15 calendar days of the due <br /> date. <br /> 6. This Note may be prepaid in whole or in part at any time without premium or penalty. <br /> Any partial prepayment shall not postpone the due date of any subsequent payments <br /> or change the amount of such payments. <br /> 7. All payments received shall be applied first to late charges, if any, next to accrued <br /> interest and then to reduce the principal amount. <br /> Appendix A to Loan Contract C150243 <br />
The URL can be used to link to this page
Your browser does not support the video tag.