Laserfiche WebLink
No fatal flaws were identified in the geotechnical investigation of the PS-2 site. The site is <br /> suitable for the planned construction. Expansive clayey soils require pier construction for <br /> the forebay storage reservoir and pump station. <br /> Pumping Station 3 (PS-3) Site Selection <br /> The 20-acre, City-owned PS-3 site meets the design criteria for the project.The site is east of <br /> Powhaton Road and south of I-70, adjacent to the Watkins Trailer Park.The site was <br /> confirmed to be suitable for the construction of PS-3 before it was purchased by the City. <br /> Figure 5 below shows the site selected for PS-3,which will include the pumping station,the <br /> future Zone 4 distribution system pumping facilities,including a storage reservoir and a <br /> pump station,and space for a future second raw water pumping station.Adequate space is <br /> available for these facilities on the selected site. The site ground elevation at PS-3 is <br /> approximately 5,600 feet above mean sea level. Figure 5 below shows the PS-3 site. <br /> 12 <br />