My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150243 PIF Documents
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
C150243 PIF Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2016 11:32:30 AM
Creation date
8/30/2016 11:32:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150243
Contractor Name
Aurora, City of
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
121
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
l Y <br /> Pumping Stations <br /> The conveyance system will include three pumping stations,located at interim points along <br /> the conveyance pipeline,as shown on Figure 2 above. <br /> The selection of sites and the feasibility of these project components are described in more <br /> detail in the following sections. <br /> Selected Alternative <br /> Pumping Station 1 Site Selection <br /> The City selected the PS-1 site as part of a larger land parcel consisting of about 28 acres <br /> between the Brighton Ditch and Brantner Ditch north of Highway 7 in Adams County.A <br /> United Power substation along Highway 7 is located immediately south of the PS-1 site. <br /> Past uses of the site include agriculture,livestock grazing, and open space.The site has an <br /> elevation of 4,979 feet above mean sea level.Figure 3 below shows the site selected for PS-1, <br /> which will include the pumping station,a forebay, and a stormwater detention basin. <br /> Adequate space is available for these facilities on the selected site.The site also includes <br /> space for a future second raw water pumping station. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.