Laserfiche WebLink
List of Figures <br /> Figure 1. Aurora Water Demand and Yield Comparison(MWH,2004) 4 <br /> Figure 2. Prairie Waters Project System Overview 6 <br /> Figure 3.Pumping Station No. 1 Site near Brighton,Colorado (MWH,2005) 10 <br /> Figure 4.Pumping Station No. 2 Site near Commerce City,Colorado (MWH,2005) 11 <br /> Figure 5.Pump Station No.3 Site near Interstate 70 in Aurora, Colorado (MWH,2005) 13 <br /> Figure 6. Prairie Waters Project Pipeline Segment No. 1 Alignment (MWH,2005) 15 <br /> Figure 7. Prairie Waters Pipeline Segment No.2 Alignment(MWH,2005) 18 <br /> Figure 8.Prairie Waters Project Segment No.3 Alignment(MWH,2005) 21 <br /> Figure 9.PWP Conveyance System Baseline Construction Schedule 23 <br /> List of Tables <br /> Table 1. Construction Cost Estimates and Encumbered Design Costs for PWP Pipelines and <br /> Pump Stations 22 <br /> Table 2.Water Enterprise Capital Plan Expenditures In 2007 Dollars ($million) 27 <br /> Table 3. Annual Cash Flow Requirements for PWP Pipeline and Pump Station Bid Packages <br /> ($million),rounded to the nearest$0.01 million 28 <br /> iv <br />