My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153623 Paid in Full Documents
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
C153623 Paid in Full Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2016 3:07:38 PM
Creation date
8/18/2016 3:04:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153623
Contractor Name
Sanchez Ditch and Reservoir Company
Contract Type
Loan
County
Costilla
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SCHEDULE A <br /> COLORADO WATER CONSERVATION BOARD <br /> CONSTRUCTION FUND PROGRAM PROCEDURES <br /> 1. Board approval of engineering firm and engirCerng agreement <br /> between engineering firm and project sponsor. <br /> 2 . Preparation of detailed plans and specifications `f6 <br /> authorized projects by consulting engineering firtl. 'r <br /> 3 . Approval of detailed plans and specifications by Board staff <br /> (plans and specifications for storage dams and reservoirs <br /> must also be approved by State Engineer's Office) . <br /> 4 . Board staff approval of bidding for the project. Board <br /> staff present at bid opening for construction. <br /> 5 . Project sponsor may issue the notice of award and the notice <br /> to proceed with construction to the contractor (both notices <br /> must be approved by the Board staff before they are issued) . <br /> 6. Conduct a pre-construction conference. Approval of <br /> construction schedule by Board staff. <br /> 7 . Construction commences. The Board staff makes periodic <br /> inspections during construction. All change orders must be <br /> approved by the Board staff in advance and before any <br /> construction on change items can commence. Emergency items <br /> cleared by telephone. <br /> 8 . The consulting engineer certifies that the project has been <br /> completed according to approved drawings and specifications <br /> and arranges for final inspection. <br /> 9 . Final inspection and acceptance of as-built project by Board <br /> staff. <br /> 10 . Submittal of as-built drawings to Board staff for approval <br /> and filing. <br /> EXHIBIT D <br />
The URL can be used to link to this page
Your browser does not support the video tag.