My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153623 Paid in Full Documents
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
C153623 Paid in Full Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/14/2016 3:07:38 PM
Creation date
8/18/2016 3:04:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153623
Contractor Name
Sanchez Ditch and Reservoir Company
Contract Type
Loan
County
Costilla
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i <br /> _ I <br /> THE SANCHEZ DITCH AND RESERVOIR COMPANY <br /> SAN ACACIO , COLORADO <br /> SPECIAL STOCKHOLDERS MEETING' 4' j <br /> APRIL 24 , 1992 -ter <br /> i _ <br /> r <br /> A special stockholders meeting was called to'"'off der <br /> P Friday , <br /> April 24 , 1992 at 3 : 30 p . m . at the company office in San Acacio , <br /> Colorado by President Fred Holmes , Jr . for the purpose of stock- <br /> holders to approved a loan with Colorado Water Conservation <br /> Board to repair the Sanchez Dam . <br /> It was determined that 17 , 310 shares were represented <br /> either in person or proxy , which was sufficient to constitute <br /> a quorm and legally conduct a meeting . <br /> Board members present : Fred Holmes , Jr . - President <br /> Walter Barker - Vice President <br /> Gerald Mathes - Secy-Treas <br /> Jeanne Sharpley -' Board Member <br /> Warren Prator - Board Member <br /> President Fred Holmes , Jr . explained to stockholders the <br /> problem at the Sanchez Dam . A sinkhole was discovered the <br /> morning of April 9th , on the up stream slope of the dam <br /> approximately 8 x 7 ft . and 2i x 4 ft . deep . On the back side <br /> of the dam the seepage was discolored . The Dam inspector <br /> Frank Kugel was immediately notified and he in return notified <br /> his superiors . <br /> Holmes , read the stop order on storing water in the Sanchez <br /> Reservoir that was received from Division of Water resources , <br /> Hal Simpson , Acting State Engineer to the stockholders . <br /> Board members met with Colorado Water Conservation Board <br /> to obtain a loan of $400 , 000 for twenty-five ( 25) years at <br /> three percent ( 3%) interest , with $150 , 000 to be used on the <br /> emergency grouting and to pay off the note of $70 , 000 that was <br /> borrowed by the company to repair the tower from First National <br /> Bank of La Jara . The balance would be used as needed to repair <br /> the outlet structure , drainage system and additional grouting <br /> if needed . <br /> Jeanne Sharpley moved to borrow $400 , 000 from Colorado <br /> Water Conservation Board at three (3%) percent interest for <br /> twenty-five ( 25) years , seconded by Delbert Lorenz . By show <br /> of hands , twelve ( 12) for and one ( 1 ) against . Carried . <br /> President Fred Holmes , Jr . appointed a credential committee <br /> consisting of Jerry Lorenz , Jack Carter and Delbert Lorenz to <br /> count the ballots . <br /> The credential committee reported the results of the votes <br /> cast as follows : <br /> 16 , 339 vote for <br /> 0 against <br /> to proceed with the loan of $400 , 000 from the Colorado Water <br /> Conservation Board to repair the Sanchez Dam . Carried . <br /> Jerry Lorenz moved to adjourn the special stockholders <br /> meeting , seconded by Jack Carter . Carried . <br /> �-/ <br /> 77Z-6/1, f '/---7'{4*-1--- <br /> Fred Holmes , Jr . President <br /> Gerald Mathes , Secy-Treas <br /> EXHIBIT B <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.