My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2017-914 Contract
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2017-914 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/4/2016 8:00:46 AM
Creation date
8/4/2016 8:00:21 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2017-914
Contractor Name
Dixon Canon Ditch and Reservoir Company
Contract Type
Loan
County
Larimer
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 5-SCHEDULE OF EXISTING DEBT <br /> No other debt, backed by the loan security, described in Section 6 below, exists. <br /> SECTION 6-LOAN SECURITY <br /> The SECURITY provided for this loan, as evidenced by the executed SECURITY <br /> AGREEMENT (APPENDIX 5) and incorporated herein, shall be a pledge of assessment <br /> revenues backed by an assessment covenant and an undivided one hundred percent <br /> (ioo%) interest in the Dixon Reservoir Dam as more particularly described in the <br /> attached DEED OF TRUST (APPENDIX 6), incorporated herein, and in accordance with <br /> CWCB Policy No. 5. <br /> SECTION 7-ADDITIONAL CONDITIONS&CONTRACT REQUIREMENTS <br /> None <br /> SECTION 8-"CONSTRUCTION FUND PROGRAM"PROCEDURES FOR PROJECTS <br /> A. The BORROWER shall employ an engineer, registered in the State of Colorado to <br /> prepare plans and specifications for the PROJECT. <br /> B. Engineering contracts and the plans and specifications must be submitted to the <br /> CWCB staff for verification of compliance with the terms of this CONTRACT when <br /> available prior to bidding. Any modifications, to the plans and specifications that <br /> effect changes to the construction costs must be approved in writing by CWCB. <br /> C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by § <br /> 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the State <br /> Engineer's Office prior to construction. <br /> D. The BORROWER shall notify CWCB of the bid opening date, time and location. CWCB <br /> staff may elect to attend the bid opening. <br /> E. CWCB must approve the award of the construction contract. <br /> F. The BORROWER shall contract for the construction of the work with responsible and <br /> capable Construction Firms, selected by the BORROWER and found acceptable by the <br /> CWCB staff. <br /> G. The BORROWER must provide a copy of the following construction contract <br /> documents: executed contractor's proposal, executed construction contract, executed <br /> performance bond, executed payment bond, executed notice of award, proposed <br /> notice to proceed, sample change order, and sample field order, as well as the <br /> advertisement for bid. After the CWCB staff verifies that these documents comply <br /> with the terms of this CONTRACT, the BORROWER may issue the notice to proceed to <br /> the Construction Firms. <br /> H. The BORROWER shall conduct a pre-construction conference at which time the CWCB <br /> staff shall have the opportunity to review and approve the construction schedule. <br /> Appendix i <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.