My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-071 Project Summary
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2015-071 Project Summary
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2016 9:59:06 AM
Creation date
7/29/2016 9:59:04 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-071
C150352
Contractor Name
Boxelder Basin Regional Stormwater Authority
Contract Type
Loan
Loan Projects - Doc Type
Project Summary
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
41/4 bNH COLORADO Larimer Ft Weld Canal Crossing Structure Project <br /> co ei Colorado Water <br /> Conservation Board Boxelder Basin Regional Stormwater Authority <br /> Substantially Complete August 1, 2016 <br /> a <br /> fr <br /> rg <br /> 07` 4 <br /> Project Description <br /> The Boxelder Basin Regional Stormwater Authority was formed in 2008, through an IGA between the City of <br /> Fort Collins, Larimer County and the Town of Wellington, to facilitate the construction of regional flood <br /> control projects to reduce the threat of flooding and remove areas from the FEMA floodplain in the Boxelder <br /> Creek basin. The crossing structure provides conveyance for 100-year flows from Boxelder Creek across the <br /> Larimer and Weld Canal in a safe and controlled manner. Previously the Boxelder Creek 100-year flows <br /> inundated the Larimer and Weld Canal, causing it to overflow west of 1-25 into the Cooper Slough drainage <br /> within the City of Fort Collins. The crossing structure is made up of a side-flow spillway and erosion control <br /> features to allow flood flows to safely pass over and across the canal. Construction started in December 2015 <br /> and was completed in April 2016. <br /> PROJECT DATA <br /> Sponsor: Boxelder Basin County: Larimer Water Source: Boxelder Creek <br /> Regional Stormwater Authority <br /> Type of Loan: Flood Control Board Approval Date: May 2013 <br /> Terms of Loan: (Original $1,010,000 at 2.75% for 15 years(Final) $835,104.53 @ 2.75% for 15 years <br /> Design Engineer: Ayres Associates <br /> Contractor: Crossfire, LLC <br /> Project Elements: Spillway construction, erosion control consisting of: gabion mattress, turf <br /> reinforcement mat (TRM), riprap, and articulated concrete block (ACB) mat <br /> Water Project Loan Program Project Summary <br />
The URL can be used to link to this page
Your browser does not support the video tag.