Laserfiche WebLink
H. Upon completion of the PROJECT construction, the BORROWER shall provide as-built drawings of <br /> the PROJECT to the CWCB staff, or, if required by § 37-87-105, C.R.S., the BORROWER shall <br /> provide the as-built drawings to the State Engineer's Office for ap• I d fling. <br /> I. Upon completion of the PROJECT construction, the BORROWER -11 g a9n inspection for <br /> the CWCB staff. <br /> J. The BORROWER shall pay all of the expenses related to t :• 'J' Tsuch bills are due. <br /> t <br /> K. PROJECT-related expenses incurred prior to the Effective e 3f t o` rat a dance with <br /> the legislative approval of this loan. <br /> SECTION 8 — ELIGIBLE EXPENSES. The following items are eligible for loan disburse <br /> A. Preparing final designs and specifications for the PROJECT. <br /> B. Preparing bid and construction contract documents. <br /> C. Preparing environmental assessment or environmental impact statements, and otherwise <br /> complying with the Federal National Environmental Policy Act. <br /> D. Complying with all federal, state, and local regulatory requirements, including the obtaining of <br /> all required permits. <br /> E. Fish and wildlife mitigation measures required by federal, state, or local laws and regulations. <br /> F. Actual construction as called for in the design documents and in change orders approved by <br /> the CWCB and the BORROWER. <br /> G. Engineering services for construction management, including design and construction <br /> management for CWCB-approved change orders. <br /> H. Interest during completion of the PROJECT pursuant to Paragraph A.4 of the Contract. <br /> I. Legal services for reviewing engineering services contracts, reviewing this Contract, reviewing <br /> construction contract documents, and for complying with all federal, state, and local regulatory <br /> requirements. <br /> SECTION 9 — DISBURSEMENT SCHEDULE <br /> For Project costs: The BORROWER shall prepare a periodic progress report which contains a statement <br /> of the PROJECT costs expended for that period and shall forward said statement to the CWCB. After <br /> receipt of the periodic progress report from the BORROWER, and review and acceptance of the items <br /> therein as eligible expenses as described above, the CWCB will pay to the BORROWER the amount set <br /> forth in the report or such portion that has been approved by the CWCB. Such payment shall be made <br /> within thirty (30) days from the CWCB's approval of each progress report. <br /> SECTION 10 —TIME FOR PERFORMANCE <br /> PROJECT Beginning: Upon Effective Date of this Contract (the date this contract is signed by the <br /> State Controller or his designee). <br /> PROJECT Finish: Two (2) years from the Effective Date of this Contract. <br /> Page 3 of 3 <br />