My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2017-913 Contract
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2017-913 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2017 3:28:57 PM
Creation date
7/28/2016 1:41:42 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2017-913
Contractor Name
Union Well Augmentation Group
Contract Type
Loan
County
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
i8. Additional Contract Requirements.Any additional contract requirements are set forth <br /> in Additional Conditions & Contract Requirements, Section 7 of the PROJECT SUMMARY. <br /> B. PROJECT PROVISIONS <br /> 1. Construction Fund Program Procedures. During the completion of the PROJECT, the <br /> BORROWER shall adhere to the CWCB Construction Fund Program Procedures, Section 8 of <br /> the PROJECT SUMMARY. <br /> 2. Eligible Expenses. The PROJECT expenses for which the BORROWER is eligible for loan <br /> disbursements are listed in Eligible Expenses, Section 9 of the PROJECT SUMMARY. <br /> 3. Loan Disbursements. The CWCB shall disburse loan funds in accordance with the <br /> Disbursement Schedule, Section io of the PROJECT SUMMARY. <br /> 4. Time for Performance. The BORROWER recognizes that time is of the essence in the <br /> performance of all of its obligations under this CONTRACT. Therefore, the BORROWER shall <br /> complete the PROJECT within the time specified in Time for Performance, Section n of the <br /> PROJECT SUMMARY. <br /> C. GENERAL PROVISIONS <br /> 1. Periodic Inspections. Throughout the term of this CONTRACT, the BORROWER shall permit a <br /> designated representative of the CWCB to make periodic inspections of the PROJECT. Such <br /> inspections shall cover the condition of the PROJECT, operating records, maintenance records, <br /> and financial records. These inspections are solely for the purpose of verifying compliance <br /> with the terms and conditions of this CONTRACT and shall not be construed or interpreted as <br /> an approval of the actual design, construction or operation of any element of the PROJECT <br /> facilities. <br /> 2. Applicable Laws. The BORROWER shall strictly adhere to all applicable federal, state, and <br /> local laws and regulations that are in effect or may hereafter be established throughout the <br /> term of this CONTRACT. <br /> 3. Designated Agent Of The CWCB. The CWCB's employees are designated as the agents of <br /> the CWCB for the purpose of this CONTRACT. <br /> 4. Assignment. BORROWER'S rights and obligations, under this CONTRACT, are personal and <br /> may not be transferred, assigned without the prior, written consent of the State. Any <br /> attempt at assignment without such consent shall be void. All assignments approved by <br /> BORROWER or the State are subject to all of the provisions hereof. <br /> 5. Contract Relationship. The Parties to this CONTRACT intend that the relationship between <br /> them under this CONTRACT is that of lender-borrower, not employer-employee. No agent, <br /> employee, or servant of the BORROWER shall be, or shall be deemed to be, an employee, agent, <br /> or servant of the CWCB. The BORROWER shall be solely and entirely responsible for its acts <br /> and the acts of its agents, employees, servants, engineering firms, construction firms, and <br /> subcontractors during the term of this CONTRACT. <br /> Page 8 of i4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.