DNR COLORADO Rehabilitation of the Livermore Irrigation Tunnel l
<br /> Co ? St
<br /> Conservation Board North Poudre Irrigation Company
<br /> ,
<br /> or Narjr Resource July 2016 Board Meeting
<br /> L O A N DETAILS
<br /> Project Cost: $ 1,597,0004ifir i 7 1 it '"'�-
<br /> CWCB Loan (with Service Fee): $ 1,451,673 s 1
<br /> Loan Term and Interest Rate: 30 years ® 2.25% ..�
<br /> Funding Source: Construction Fund 5 * fit
<br /> BORROWER TYPE ���
<br /> Agriculture Municipal Commercial ipi0*
<br /> 411-*
<br /> 26% 0% Low - 73%Mid - 0% High 1
<br /> PROJECT DETAILS .4441416
<br /> Project Type: Ditch Rehabilitation 7 if
<br /> Average Annual Delivery: 44,400 AF
<br /> LOC A TION
<br /> The North Poudre Irrigation Company service area County: Larimer
<br /> encompasses approximately 300 square miles, including Water Source: Cache la Poudre River
<br /> 160 square miles of service area under the North Poudre
<br /> Canal (36 square miles of irrigated acreage),as well as Drainage Basin: South Platte River
<br /> additional service areas covering 14 communities and Division: 1 District: 3
<br /> municipal water providers that own NPIC shares.
<br /> The Livermore Tunnel carries water diverted from the North Poudre Canal headgate, located on the
<br /> north side of the North Fork Cache la Poudre River, for approximately 4,900 feet before it is discharges
<br /> into an earth-lined open canal and flows on toward the Buckeye Lateral, Park Creek Reservoir, and the
<br /> Company's downstream delivery infrastructure.
<br /> The Livermore Tunnel consists of two tunnels connected by a short section of open channel. The tunnels
<br /> are approximately 8.5 feet high and 8 feet wide with a concrete invert along the entire tunnel length.
<br /> The tunnels are considered generally stable with the exception of six collapse zones where large piles of
<br /> rock and debris have accumulated in the base of the tunnel, ponding up to three feet of water and
<br /> restricting the overall flow capacity. The geometry
<br /> of the collapse zones varies; however, the
<br /> disrupted zones were estimated visually to be up to
<br /> 45 feet high and 35 feet wide. An ongoing concern Project
<br /> is of roof or partial collapse in the tunnel, which
<br /> could result in severe disruption of water service Site
<br /> for 14 communities and over 200 farms. The
<br /> project will also include proactive repairs to an . ;ermore
<br /> additional ten shear/void areas. ce
<br /> Construction is scheduled for the fall/winter of
<br /> 2016/2017.
<br /> Pletlingt
<br /> A— 32'''' ,r r „`: South Platte 1i
<br /> �, , :. itis"'1 .4-r, -. '` t
<br /> ,i7—,,,,,,,.,..Y-,',,,,y -. ,,,-,,-Y, ,„,g-er,rt‘:,-,:i.4 ,.
<br /> . "`.; "'fir
<br /> 1 Bellvue Laporta
<br /> 4"..*:.
<br /> •uLrr Yl.1"
<br /> „Il..( .1: .,*.atttin,' � _ . Fort dins
<br /> o ms
<br /> Water Project Loan Program - `” • - i ata Sheet
<br />
|