Laserfiche WebLink
DNR COLORADO Rehabilitation of the Livermore Irrigation Tunnel l <br /> Co ? St <br /> Conservation Board North Poudre Irrigation Company <br /> , <br /> or Narjr Resource July 2016 Board Meeting <br /> L O A N DETAILS <br /> Project Cost: $ 1,597,0004ifir i 7 1 it '"'�- <br /> CWCB Loan (with Service Fee): $ 1,451,673 s 1 <br /> Loan Term and Interest Rate: 30 years ® 2.25% ..� <br /> Funding Source: Construction Fund 5 * fit <br /> BORROWER TYPE ��� <br /> Agriculture Municipal Commercial ipi0* <br /> 411-* <br /> 26% 0% Low - 73%Mid - 0% High 1 <br /> PROJECT DETAILS .4441416 <br /> Project Type: Ditch Rehabilitation 7 if <br /> Average Annual Delivery: 44,400 AF <br /> LOC A TION <br /> The North Poudre Irrigation Company service area County: Larimer <br /> encompasses approximately 300 square miles, including Water Source: Cache la Poudre River <br /> 160 square miles of service area under the North Poudre <br /> Canal (36 square miles of irrigated acreage),as well as Drainage Basin: South Platte River <br /> additional service areas covering 14 communities and Division: 1 District: 3 <br /> municipal water providers that own NPIC shares. <br /> The Livermore Tunnel carries water diverted from the North Poudre Canal headgate, located on the <br /> north side of the North Fork Cache la Poudre River, for approximately 4,900 feet before it is discharges <br /> into an earth-lined open canal and flows on toward the Buckeye Lateral, Park Creek Reservoir, and the <br /> Company's downstream delivery infrastructure. <br /> The Livermore Tunnel consists of two tunnels connected by a short section of open channel. The tunnels <br /> are approximately 8.5 feet high and 8 feet wide with a concrete invert along the entire tunnel length. <br /> The tunnels are considered generally stable with the exception of six collapse zones where large piles of <br /> rock and debris have accumulated in the base of the tunnel, ponding up to three feet of water and <br /> restricting the overall flow capacity. The geometry <br /> of the collapse zones varies; however, the <br /> disrupted zones were estimated visually to be up to <br /> 45 feet high and 35 feet wide. An ongoing concern Project <br /> is of roof or partial collapse in the tunnel, which <br /> could result in severe disruption of water service Site <br /> for 14 communities and over 200 farms. The <br /> project will also include proactive repairs to an . ;ermore <br /> additional ten shear/void areas. ce <br /> Construction is scheduled for the fall/winter of <br /> 2016/2017. <br /> Pletlingt <br /> A— 32'''' ,r r „`: South Platte 1i <br /> �, , :. itis"'1 .4-r, -. '` t <br /> ,i7—,,,,,,,.,..Y-,',,,,y -. ,,,-,,-Y, ,„,g-er,rt‘:,-,:i.4 ,. <br /> . "`.; "'fir <br /> 1 Bellvue Laporta <br /> 4"..*:. <br /> •uLrr Yl.1" <br /> „Il..( .1: .,*.atttin,' � _ . Fort dins <br /> o ms <br /> Water Project Loan Program - `” • - i ata Sheet <br />