My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2017-1402 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
6001-7000
>
CT2017-1402 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 8:25:16 AM
Creation date
7/25/2016 9:09:35 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2017-1402
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
North Poudre Irrigation Company Agenda Item 13b <br /> July 20-21, 2016 Board Meeting(Updated July 22, 2016) <br /> Page 2 of 5 <br /> Background <br /> The Company's service area encompasses approximately 300 square miles, including additional service <br /> areas covering 14 communities and municipal water providers that own NPIC shares. The Livermore <br /> Tunnel provides water via the North Poudre Canal to serve 160 square miles of service area, with 36 <br /> square miles of irrigated acreage. The Company operates 21 storage reservoirs, 5 flood control dams, <br /> and approximately 200 miles of ditches. Irrigated acreage within the service area supports production of <br /> corn, sugar beets, soybeans, hay, and feed crops. <br /> The Livermore Tunnel carries water diverted from the North Poudre Canal headgate, located on the <br /> north side of the North Fork Cache la Poudre River, for approximately 4,900 feet before it discharges <br /> into an earth-lined open canal and flows on toward the Buckeye Lateral, Park Creek Reservoir, and the <br /> Company's downstream delivery infrastructure. <br /> The Livermore Tunnel consists of two tunnels connected by a short section of open channel. The tunnels <br /> are approximately 8.5 feet high and 8 feet wide with a concrete invert along the entire tunnel length. <br /> The tunnels are considered generally stable with the exception of six collapse zones, meaning rock fall <br /> events have occurred and large piles of rock and debris have accumulated in the base of the tunnel, <br /> ponding up to three feet of water and restricting the overall flow capacity of the tunnels. Three of the <br /> six collapse zones are considered active, where the rock fall events are frequent. Occasional rock fall is <br /> occurring in the remaining three collapse zones. In addition, ten shear/void areas are proposed to be <br /> proactively repaired to avoid future deterioration. <br /> The geometry of the collapse zones varies; however, the disrupted zones were estimated visually to be <br /> as large as 45 feet high and 35 feet wide. Potential roof or partial collapse in the tunnel is an ongoing <br /> concern, and would impact system users with a prolonged system outage. A major collapse event could <br /> result in severe disruption of water service for 14 communities and over 200 farms. <br /> Loan Feasibility Study <br /> Dave Rau of Paragon Consulting Group, Inc. and John Sikora, P.E. of AECOM Technical Services prepared <br /> the Loan Feasibility Study titled "Feasibility of the Livermore Irrigation Tunnel Rehabilitation Project", <br /> dated June 6, 2016. The study includes an analysis of alternatives, preliminary engineering design, and <br /> cost estimates. The study was prepared in accordance with CWCB guidelines. <br /> Borrower - North Poudre Irrigation Company <br /> The Company is a Mutual Ditch Company established in 1901. The Company's office is located in <br /> Wellington. It operates as a nonprofit corporation and is in good standing with the Colorado Secretary of <br /> State. The Company has issued 10,000 shares of stock and currently has 570 shareholders. Company <br /> revenues derive primarily from assessments charged on shares of stock owned by the stockholders. The <br /> Company also receives revenues from recreational leases, and annual payments from the City of Fort <br /> Collins for the sale of Halligan Reservoir. <br /> The Company's by-laws empower the Board of Directors to take on debt for the uses, needs, and <br /> demands of the Company, and to set assessments accordingly. The Board has the authority to enforce <br /> assessments, including suspending water deliveries and sale or forfeiture of shares for failure to pay <br /> assessments. <br /> Water Rights <br /> There are 197 water rights and exchanges, 27 of which are owned by the Company, that rely on the <br /> North Poudre Canal and the Livermore Tunnel. The Company continually executes a series of complex <br /> exchanges and trades within the Cache la Poudre Basin. There are exchanges and trades for water from <br /> Joe Wright Reservoir, Halligan Reservoir, Fossil Creek Reservoir, and Worster Reservoir to the Company's <br /> diversion structures. These exchanges create a flexible water supply for agricultural producers and <br /> municipal water providers. The Company also owns and operates 22 reservoirs, with a combined 220,000 <br /> acre-feet of storage, which are used for a variety of trades and exchanges to efficiently deliver water <br /> within the Company service area. <br />
The URL can be used to link to this page
Your browser does not support the video tag.