Laserfiche WebLink
„ , DN COLORADOodtArkansas Valley Conduit Phase One <br /> co er <br /> Conservation Board Pueblo Dam Hydroelectric Project <br /> Southeastern Colorado Water Conservancy District <br /> July 2016 Board Meeting <br /> LOAN DETAILS <br /> Project Cost: $19,060,000 kr iWkitf ---._CWCB Loan (with Service Fee): $17,392,200 6 1 <br /> Loan Term and Interest Rate: 30 Years ® 2.0% <br /> Funding Source: Severance Tax PBF BORROWER TYPE hAP* •�.ibliN <br /> Hydropowerr ' <br /> PROJECT DET AILS <br /> Project Type: Hydroelectric , 14' 11411 <br /> Average Annual Power Production: 28M KWh 7 r <br /> Southeastern Colorado Water Conservancy District, acting ( i� <br /> by and through its water activity enterprise, is applying L OC A TION <br /> for a loan for the construction of the Pueblo Dam County: Pueblo <br /> Hydroelectric Project. The Project is located at the Water Source: Arkansas River <br /> existing Pueblo Dam and will utilize the existing releases Drainage Basin: Arkansas River <br /> to the Arkansas River without changing the flow regime. Division: 2 District: 10 <br /> This Project is being constructed as Phase One of the <br /> overall Arkansas Valley Conduit project, authorized in the <br /> 2007 and 2009 Projects Bill (SB07-122, SB09-125). The purpose of the Project is to develop a revenue <br /> source to offset the operational and maintenance cost of the Arkansas Valley Conduit. <br /> The proposed 7.5 megawatt facility will be located on the North Outlet of Pueblo Dam. A powerhouse <br /> would be located at the downstream end of the existing outlet works that supplies water to the <br /> Arkansas River and would allow the Dam's authorized releases to generate an annual average 28 million <br /> kWh (enough to power approximately 3,300 homes) and $1,500,000 in average revenue per year. The <br /> Project is being performed under the U.S. Bureau of Reclamation's Lease of Power Privilege (LOPP) <br /> process. Power generated will be purchased by Colorado Springs Utilities via transmission through the <br /> local Black Hills Energy power delivery system. Construction is planned to start in October 2016 for <br /> commissioning in May 2018. <br /> . s O O i 44F A 5 1 E R N C O L O R A D O <br /> Water Conservancy District <br /> -414.SIM.- )our met$rncnl in Maser” <br /> ` <br /> ,y � w� -+ Colorado Springs Utilities <br /> _ <br /> • y o�PA�meNr of rtie rHr�10 R's how we're all connected <br /> 110Aill <br /> 44. <br /> \gV '.4U OF REO'LAM)At�� <br /> _- - � ` Project Site <br /> --- r <br /> s 0 <br /> iri -- <br /> - -.,., x ,740,e4L1 Ir.n.,,wp l A, <br /> —'111 <br /> v <br /> Water Project Loan Program - Project Data Sheet <br />