My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2017-916 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2017-916 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 9:14:33 AM
Creation date
7/22/2016 9:14:11 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2017-916
Contractor Name
Grand Junction, City of
Contract Type
Grant/Loan Combo
Water District
4
County
Mesa
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RESOLUTION NO. 19-16 <br /> A RESOLUTION AUTHORIZING THE INTERIM CITY MANAGER TO ENTER INTO A <br /> CONTRACT FOR GRANT AND LOAN FUNDING FROM THE COLORADO WATER <br /> CONSERVATION BOARD FOR CONSTRUCTION WORK ON THE HALLENB CK <br /> NUMBER ONE DOWNSTREAM SLOPE IMPROVEMENTS PROJECT <br /> Recitals: <br /> The request from the Colorado Water Conservation Board in the form of a grant in the <br /> amount of $100,000 and loan of up to $1,010,000 would fund the $879,000 project o <br /> mitigate damage to the Hallenbeck Reservoir No. 1 dam ("Project"). The Project wi I <br /> mitigate the structural failure, provide improved control of seepage through the stru tune <br /> and return 699 acre feet of raw water storage to the City water system. <br /> The grant in the amount of $100,000 has been awarded and the loan of $1 ,010,000 has <br /> been approved through the Colorado Water Conservation Board. Project expenditures <br /> are anticipated to accrue the summer of 2016. <br /> NOW, THEREFORE, BE IT HEREBY RESOLVED BY THE CITY COUNCIL OF <br /> THE CITY OF GRAND JUNCTION THAT: <br /> The Interim City Manager is authorized to enter into a contract with the Colorado <br /> Water Conservation Board for a Grant and a Loan for the Hallenbeck No. 1 <br /> Downstream Slope Repair Project. <br /> PASSED AND APPROVED this 4th day of May 2016. <br /> b Oh <br /> 4/ t': <br /> r ' <br /> 0/ it . -.�,�. \� Pre-ant of the Council <br /> ATTEST: ,—. <br /> � `-r <br /> . : . <br /> \1 ............4. ., y 1r <br /> i <br /> City,Cle' <br /> APPENDIX 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.