My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2017-916 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2017-916 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/22/2016 9:14:33 AM
Creation date
7/22/2016 9:14:11 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2017-916
Contractor Name
Grand Junction, City of
Contract Type
Grant/Loan Combo
Water District
4
County
Mesa
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
prepare plans and specifications for the PROJECT. <br /> B. Engineering contracts and the plans and specifications must be submitted tq the <br /> CWCB staff for verification of compliance with the terms of this CONTRACT hen <br /> available prior to bidding. <br /> C. For plans and specifications for all jurisdictional dams and reservoirs, as defined <br /> by § 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the <br /> State Engineer's Office prior to construction. <br /> D. The BORROWER shall notify CWCB of the bid opening date, time and loction. <br /> CWCB staff may elect to attend the bid opening. <br /> E. CWCB must approve the award of the construction contract. <br /> F. The BORROWER shall contract for the construction of the work with responsible and <br /> capable construction firms selected by the BORROWER and found acceptable by the <br /> CWCB staff. <br /> G. The BORROWER must provide a copy of the following construction contract <br /> documents: executed contractor's proposal, executed construction con{tract, <br /> executed performance bond, executed payment bond, executed notice of award, <br /> proposed notice to proceed, sample change order, and sample field order, as well <br /> as the advertisement for bid and bid bond at bidding. <br /> H. The BORROWER shall conduct a pre-construction conference at which time the <br /> CWCB staff shall have the opportunity to review and approve the construction <br /> schedule. <br /> I. The BORROWER shall provide construction inspection of the project in accordance <br /> with Rule 9 for Dam Safety and Dam Construction, 2-CCR 402-1. <br /> J. The BORROWER shall construct the PROJECT in accordance with the approved <br /> plans and specifications. <br /> K. Upon completion of the PROJECT construction, the BORROWER shall provide as built <br /> drawings of the PROJECT to the CWCB staff, or, if required by § 37-87-105, C. .S., <br /> the BORROWER shall provide the as-built drawings to the State Engineer's Offi for <br /> approval and filing. <br /> L. Upon completion of the PROJECT construction, the BORROWER shall invite CliNCB <br /> staff to a final inspection. <br /> M. The BORROWER shall pay all of the expenses related to the PROJECT when such <br /> bills are due and not reasonably disputed by the BORROWER. <br /> SECTION 9—ELIGIBLE EXPENSES. <br /> The following items are eligible for loan disbursements: <br /> A. Preparing final designs and specifications for the PROJECT. <br /> Appendix 1 <br /> Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.