My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153656 Paid in Full Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C153656 Paid in Full Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2016 9:43:52 AM
Creation date
7/12/2016 2:53:14 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153656
Contractor Name
Loloff Lateral Ditch Company
Contract Type
Loan
County
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Annual Meeting <br /> Loloff Lateral Ditch Company <br /> February 9, 1995 <br /> page 2 1, <br /> Discussion on the trash rack was opened by J. D. ck <br /> build a new trash rack Loloff construction has esti 1410 <br /> - <br /> of $2100 . Shareholders threw around ideas of making the : sh <br /> rack adjustable somehow but were not sure how wide or n . <br /> make the grid to make it the most effective. Kevin Chesnut <br /> offered the idea that we do some repair work on the existing <br /> trash rack and make it work for another year. <br /> J. D. opened discussion on uses for the old tile line. It was <br /> stated that work needs to be done to the old tile line before it <br /> even has a possibility of being used. Some of the boxes have ' o <br /> come out and a few patches made. If the ditch company allows <br /> outsiders use of the pipeline, they need to make arrangement - o <br /> they are no liable. <br /> J.D. stated that we need another meeting before use of the ne <br /> pipeline begins to make sure that everyone is clear on proper <br /> operation procedures. <br /> Motion was made by Don Loloff that the salary of the secretar <br /> stay the same at this time, $50. 00 per year. Motion seconded uy <br /> Jim Hendricks. Motion carried. <br /> A motion was made by Mary Chesnut that when we get total annu.: 1 <br /> payment it should be mailed to stockholders. Motion was secon"ed <br /> by Don Loloff. Motion carried. <br /> At 8 : 40 p.m. it was moved by Lester Stroh and seconded by Bob <br /> Suden to adjourn the meeting. Motion carried. <br /> Respectfully submitted, <br /> Julie Chesnut, Secretar <br />
The URL can be used to link to this page
Your browser does not support the video tag.