Laserfiche WebLink
SCHEDULE A <br /> COLORADO WATER CONSERVATION BOARD <br /> CONSTRUCTION FUND PROGRAM PROCEDURES <br /> 1. :oard approval of engineering firm and engineering agreemen en <br /> gineering firm and project sponsor. <br /> 2. 'reparation of detailed plans and specifications for a IT <br /> cc.nsulting engineering firm. <br /> 3. pproval of detailed plans and specifications by Board staff (plans and <br /> S.ecifications for storage dams and reservoirs must also be approved by Stat <br /> ngineer's Office). <br /> 4. oard staff approval of bidding for the project. Board staff present at bid <br /> .'pening for construction. <br /> 5. 'roject sponsor may issue the notice of award and the notice to proceed wit''I <br /> ••nstruction to the contractor (both notices must be approved by the Board .taff <br /> •efore they are issued). <br /> 6. I onduct a pre-construction conference. Approval of construction schedule •y <br /> oard staff. <br /> 7. : onstruction commences. The Board staff makes periodic inspections durin„ <br /> •.nstruction. All change orders must be approved by the Board staff in adv;nce <br /> .nd before any construction on change items can commence. Emergency it. <br /> .i eared by telephone. <br /> 8. e consulting engineer certifies that the project has been completed accor. ng to <br /> .'pproved drawings and specifications and arranges for final inspection. <br /> 9. inal inspection and acceptance of as-built project by Board staff. <br /> 10. 'ubmittal of as-built drawings to Board staff for approval and filing. <br /> EXHIBIT D <br />