My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153656 Paid in Full Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C153656 Paid in Full Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2016 9:43:52 AM
Creation date
7/12/2016 2:53:14 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153656
Contractor Name
Loloff Lateral Ditch Company
Contract Type
Loan
County
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
A meeting of the Loloff Lateral Ditch Company was held at the home of J.D. <br /> Eckhardt on March 8, 1993. The meeting was called to order by the president, <br /> J.D. Eckhardt, at 7:10 p.m. <br /> Robert Suden, Jack Hendricks, Ed Loloff, Mary Chestnut, and J.D. Eckhardt were <br /> present. Lester Stroh was absent. <br /> Old Business: <br /> 1. Minutes of the 1992 annual meeting of the Loloff Lateral Ditch Co pany <br /> were read and approved. <br /> 2. Treasurer's Report: All bills have been., paid + h. e is a balan.e of <br /> $5,346.83 on hand. ' <br /> 3. Replacing Tile Line: It was reported t e ASS •=' -d $72 500, <br /> which is one-half the estimated cost • 'ect. %tal co:.t is <br /> estimated at $145,000. The grant can' so more than $10,000 <br /> per shareholder. The Colorado Water r• has allo.ated <br /> $71,500 for the project, at 5t interest for 4. s e • rea.y to <br /> proceed with the loan contract. The ASCS o fi - 1 o a inal <br /> engineering report. When that is done the project c- ' .u) out for <br /> bids. <br /> New Business: <br /> 1. It was discussed whether to tile from the end of the old line east o Ed <br /> Loloff and Lester Stroh's tile line at the same time we replace the old <br /> line. It was moved by Ed Loloff and seconded by Mary Chestnut th-t we <br /> table this matter. Motion carried. <br /> 2. Election of Board Members: It was moved by Mary Chestnut and seconded by <br /> Ed Loloff to elect J.D. (James D.) Eckhardt as President, Lester Str•h as <br /> First Vice-President, and Mary Chestnut as Second Vice-President. Motion <br /> carried. <br /> 3. It was moved by Mary Chestnut and seconded by Ed Loloff to authoriz the <br /> President, J.D. (James D.) Eckhardt to proceed with loan applic•:tion <br /> requirements and to enter into the loan contract with the Colorado ' ater <br /> Conservancy Board. Motion carried. <br /> 4. Mr. Eugene Frisk has relinquished his Stock Certificates in the amo t of <br /> two shares in the Loloff Lateral Ditch Company to the Loloff Lateral *itch <br /> Company. <br /> 5. It was moved by Ed Loloff and seconded by Robert Suden to kee• the <br /> assessments at $75.00 per share for the 1993 season. Motion carries . <br /> As there was no further business to come before the Board, it was moved by Mary <br /> Chestnut and seconded by Jack Hendricks to adjourn the meeting. Motion car ied. <br /> Respectfully submitted, <br /> Fred C. Herbst, Secretary <br /> The above is a true and accurate copy of the minutes of the Loloff Lateral pitch <br /> Company. The meeting was held on March 8, 1993. <br /> Fred C. Herbst, Secretary <br /> / r <br />
The URL can be used to link to this page
Your browser does not support the video tag.