My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C154219 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C154219 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2020 1:16:22 PM
Creation date
6/20/2016 3:23:42 PM
Metadata
Fields
Template:
Grants
Applicant
San Luis Valley Irrigation District
Grant Type
Non-Reimbursable
Project Name
Rio Grande Cooperative Project
CWCB Section
Finance
Contract/PO #
C154219
CT2015-073
Grants - Doc Type
Contract/Purchase Order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
most economic solution.To that end,we recommend preparing the bidding documents with two <br /> options: Option 1 - Demolish Existing Sluice Gate Structure and Option 2 - Construct Bypass Tunnel <br /> and Abandon Sluice Gate Structure.The District can then select which option is most economic <br /> based on the results of the bidding.Another important element of the low level outlet works is the <br /> provision for the future addition of hydropower.To allow hydropower to be added in the future <br /> with minimal disturbance to the primary function of the project,a tap will be provided at the low <br /> level outlet(downstream of the tunnel portal) which can be used to route flows to future turbine <br /> generator units. <br /> 3.) Spillway Improvements - In order to achieve the spillway capacity required by the State <br /> engineer's Office (SEO), the entrance training walls will require a substantial raise and the main <br /> channel training walls will require a roughly 2 to 6-foot raise.This is expected to be accomplished <br /> by a combination of cast-in-place concrete and perhaps shotcrete.Additionally,some of the existing <br /> spillway floor slabs will require replacement or rehabilitation due to the condition of the existing <br /> concrete. <br /> The CWCB's 2012 Projects Bill authorized and appropriated a $5 million grant to the SLVID to <br /> perform the design and other activities towards the rehabilitation of Rio Grande Reservoir,as part <br /> of the Rio Grande Cooperative Project. The 2012 Projects Bill also authorized an additional $15 <br /> million towards to the project,as a loan/grant combination,which will be determined by the CWCB <br /> board at a later date. CWCB is currently working with SLVID in spending the $5 million grant <br /> funds,which will involve a number of different activities,such as; final design, project management, <br /> material and equipment purchase,and various construction activities, over the next few years. <br /> The following Statement of Work will be conducted primarily by San Luis Valley Irrigation District's <br /> Sub-Contractor, DiNatale Water Consultants. <br /> SCOPE OF WORK <br /> Task 1-Assistance with Negotiating a Land Exchange with the Forest Service <br /> Description of Task:The purpose of this task is to assist with negotiating a land exchange with the Forest <br /> Service. The District would like to exchange part of its land near the reservoir for Forest Service land directly <br /> below the Rio Grande Reservoir dam. This task will be completed by the Rio Grande Cooperative Project <br /> Team (Project Team).The Project Team consists of the District,Western Land Group,Tod Smith,the <br /> District's attorney, Deere &Ault Consultants and DWC. <br /> 1. DWC will coordinate the efforts of the Project Team on securing a land exchange with the Forest <br /> Service. Western Land Group will be the lead on this effort. <br /> a. Numerous meetings will be held with the Forest Service and Western Land Group to discuss <br /> the terms of exchange. <br /> b. Development of an exchange proposal for the proposed land exchange. <br /> Task Execution: <br /> The Project Team <br /> Assumptions: <br /> Western Land Group will be the lead and primary contact with the Forest Service <br /> 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.