My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C154210 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C154210 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2020 12:59:22 PM
Creation date
6/20/2016 2:11:55 PM
Metadata
Fields
Template:
Grants
Applicant
San Luis Valley Irrigation District
Grant Type
Non-Reimbursable
Project Name
Rio Grande Reservoir Rehabilitation Project -Reservoir Design
CWCB Section
Finance
Contract/PO #
C154210
CT2015-072
CT2019-2880
Grants - Doc Type
Contract/Purchase Order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The final report that will be submitted to the SEO will include the District's comments along with the design <br /> team's internal QA/QC comments. <br /> Deliverables: Draft and Final Basis of Design Reports <br /> Task 7-Spillway Rehabilitation Design <br /> Drawings and Technical Specifications will be prepared for the spillway rehabilitation portion of the project. <br /> This is anticipated to include spillway entrance training wall additions, raising the training walls along the <br /> right and left sides of the spillway chute, replacement or rehabilitation of failed spillway slabs, and armoring <br /> in the area of the plunge pool. <br /> Drawings will be prepared in AutoCAD 2011, or later version, using D&A's company standards. Drawings <br /> will be prepared in 22-inch by 34-inch format with true half-sizes at 11-inch by 17-inch. Technical <br /> Specifications will follow the 17 Division CSI format. D&A's standard technical specifications will be <br /> followed and the District's standard front-end contract documents will be used. <br /> Progress submittals will be made at the 30 percent, 90 percent, and 100 percent levels of completion. <br /> Progress submittals will be made electronically and at half-size hard copy. At the 100 percent level of <br /> completion, documents will be full size signed and sealed in accordance with Colorado law and submitted to <br /> the SEO for review and approval. It should be noted that the progress submittals for other portions of the <br /> work will be combined in a single drawing and specification set. <br /> Deliverables: 30 percent, 90 percent, and 100 percent Drawings and Technical Specifications <br /> Task 8-Clay Blanket Design <br /> Drawings and Technical Specifications will be developed for the upstream clay blanket permeability barrier. <br /> Drawing and specification format and progress submittals will be the same as described under Task 7. The <br /> design of the clay blanket is expected to include plans, cross-sections, and details that describe the site <br /> preparation required in advance of blanket installation; location of the clay blanket; and thickness, material <br /> type, and gradation for each zone. This task will also cover the design and installation of additional toe <br /> drains on the downstream left abutment of the dam. <br /> Deliverables: 30 percent, 90 percent, and 100 percent Drawings and Technical Specifications <br /> Task 9-Bypass Tunnel Design <br /> Drawings and Technical Specifications will be developed for the bypass tunnel option. Drawing and <br /> specification format and progress submittals will be the same as described under Task 7. The design of the <br /> bypass tunnel will involve a 14-foot finished diameter tunnel that bypasses the existing sluice gate structure <br /> in the outlet tunnel and will be included in the contract documents as Option 2. Work in this task will also <br /> include the design of Option 1 which involves the demolition of the existing sluice gate structure with no <br /> bypass tunnel constructed. The Option I design will include demolition drawings,rock anchoring portions <br /> of the old concrete,and installation of a new reinforced concrete or shotcrete crown liner to create a <br /> hydraulically smooth crown of the tunnel where the gate structure was removed. The design of the bypass <br /> tunnel will include rock bolt support design for the tunnel intersections and thin shotcrete liner for <br /> pressurized tunnel sections. <br /> Deliverables: 30 percent, 90 percent, and 100 percent Drawings and Technical Specifications <br /> - 6 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.