My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C154210 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C154210 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2020 12:59:22 PM
Creation date
6/20/2016 2:11:55 PM
Metadata
Fields
Template:
Grants
Applicant
San Luis Valley Irrigation District
Grant Type
Non-Reimbursable
Project Name
Rio Grande Reservoir Rehabilitation Project -Reservoir Design
CWCB Section
Finance
Contract/PO #
C154210
CT2015-072
CT2019-2880
Grants - Doc Type
Contract/Purchase Order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br /> 22. SIGNATURE PAGE Contract Routing Number it L(1;1 <br /> THE PARTIES HERETO HAVE EXECUTED THIS CONTRACT <br /> * Persons signing for Contractor hereby swear and affirm that they are authorized to act on Contractor's behalf and <br /> acknowledge that the State is relying on their representations to that effect. <br /> CONTRACTOR STATE OF COLORADO <br /> San Luis Irrigation District <br /> By: Randall K.Palmgren John W.Hickenlooper,Governor <br /> Title: President Colorado Water Conservation Board <br /> - ni er 116 bel :irector <br /> p , <br /> , 1;.:17&4441X--.)—fra4) Z1--41 <br /> *Sign e <br /> i <br /> Jennifer Gi •el,Director CWCB <br /> Date: gg c;01 <br /> //y/ <br /> Date: <br /> 2nd Contractor Signature if Needed LEGAL REVIEW <br /> By: John W. Suthers,Attorney General <br /> Title: <br /> *Signature By: /14/ <br /> Signature-Assistant Attorney General <br /> Date: <br /> Date: <br /> ALL CONTRACTS REQUIRE APPROVAL BY THE STATE CONTROLLER <br /> CRS§24-30-202 requires the State Controller to approve all State Contracts.This Contract is not valid until signed and dated <br /> below by the State Controller or delegate.Contractor is not authorized to begin performance until such time.If Contractor <br /> begins performing prior thereto,the State of Colorado is not obligated to pay Contractor for such performance or for any goods <br /> and/or services provided hereunder. <br /> STATE CONTROLLER <br /> David J.McDermott,CPA <br /> By: die <br /> n t u?� 2)/1//2. <br /> Date: 712 s// <br /> Page 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.