My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C154210 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C154210 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2020 12:59:22 PM
Creation date
6/20/2016 2:11:55 PM
Metadata
Fields
Template:
Grants
Applicant
San Luis Valley Irrigation District
Grant Type
Non-Reimbursable
Project Name
Rio Grande Reservoir Rehabilitation Project -Reservoir Design
CWCB Section
Finance
Contract/PO #
C154210
CT2015-072
CT2019-2880
Grants - Doc Type
Contract/Purchase Order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SCHEDULE <br /> It is assumed that the surveying task will be authorized by the District in advance of the main work and that <br /> authorization for the entire project will be given sometime after July 1 of 2012. The work under this <br /> Statement of Work shall be completed by December 31, 2019. <br /> COMPENSATION <br /> The contract work described above on a time and materials basis with a not to exceed amount of$1,840,174. <br /> The attached spreadsheet provides a detailed breakdown of the fees. It is understood by the parties that as <br /> the project evolves and additional data is obtained, that tasks and their associated schedule and costs may be <br /> modified(decreased or increased)to reflect current needs for successful completion of the project. It is <br /> understood that the District will not exceed the estimated total without first obtaining a fully executed <br /> amendment to the contract. <br /> Performance Monitoring <br /> Performance monitoring for the contract shall include the following: <br /> (a) Performance measures and standards <br /> • The CWCB will have monthly meetings with the vendor and the Engineering CO to make sure <br /> the project is being completed in a timely manner. <br /> (b) Accountability. <br /> • Regular reporting of project status will occur monthly with the CWCB project manager and the <br /> lead project manager from the vendor and the Engineering CO. <br /> (c) Monitoring Requirements <br /> • The CWCB will have access to all the plans associated with the Rio Grande Darn and Reservoir <br /> rehabilitation and enlargement. <br /> (d) Noncompliance Resolution <br /> • Noncompliance resolution will be handled through the contract resolution. <br /> - 10 - <br />