My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2015-047 Time Extention Request letter
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2015-047 Time Extention Request letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/1/2016 2:21:25 PM
Creation date
6/1/2016 2:21:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2015-047
C150364
Contractor Name
Huerfano County Water Conservancy District
Contract Type
Grant/Loan Combo
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(f-Xca--A_) C, ) cG0i5 ,3 7 <br /> Huerfano County Water Conservancy District <br /> Office address:23512 US I Iwy 160,Walsenburg,Colorado 81089 <br /> Mailing address:P.O.Box 442,La Veta.Colorado 81055 <br /> hcwcdistrict,a ma:i.cc <br /> Office:719-738-2418 <br /> April 9, 2016 <br /> Anna Mauss, P.E. <br /> Water Project Loan Program, Finance Section <br /> Colorado Water Conservation Board <br /> 1313 Sherman St, Room 718 <br /> Denver, CO 80203 <br /> re: Request for Extension; Loan Contract#C150364 for HCWCD's regional <br /> augmentation plan <br /> Dear Anna, <br /> Please accept this request for an extension under the above contract to June 12, 2019. As <br /> it stands now,the loan contract(p. 11, and p. 4 of Appendix 1)provides that project <br /> completion will be within three years of the contract's effective date or January 9, 2017. <br /> As described below,the District has encountered unforeseen delays necessitating an <br /> extension. This is submitted contemporaneously with a similar request regarding the <br /> related Grant Agreement#C150551 for the Red Wing Augmentation Facility. <br /> Thanks to the loan,the District purchased the needed senior water right(along with the <br /> Camp Ranch itself)and built and operated the augmentation facilities needed on the <br /> ranch. As a result,with the addition of mil levy income,we have received SEO approval <br /> of annual SWSPs operations through 2016 and have continued to supply augmentation <br /> water to the Town of Gardner(including the school),many rural residents by use of the <br /> fill station for their cisterns, several out of compliance subdivisions,the Huerfano County <br /> board of Commissioners and several other users. Along the way, we completed a Phase I <br /> environmental site assessment, obtained the appropriate Huerfano County HB 1041 <br /> permit and a USACE Nationwide §404 Permit Verification, and contracted for the <br /> engineering design and construction supervision of RWAF (completion of that contract <br /> awaits issuance of a water court decree). Of the$2,222,000 principal amount of the loan, <br /> $249,134 remains to be drawn. <br /> In December,2013,the District applied for Water Court approval of a permanent <br /> regional augmentation plan in Case No. 13CW3062, Water Division 2. There were ten <br /> statements of opposition to the application of which all but two have been resolved by <br /> stipulation. Of those two (1)we have reached a hand-shake deal with the SEO, CWCB, <br /> and DEO and expect to execute a written stipulation before the end of this month and(2) <br /> have yet to resolve the opposition of a neighboring water rights owner, Lucy Hibberd, <br /> although we are continuing to make efforts to do so. <br /> C:\My Files\HCWCD\CWCB Loan\Extensions\20160409 LT Anna Mauss.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.