My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2017-904 Approval Letter
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2017-904 Approval Letter
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 8:25:16 AM
Creation date
5/23/2016 2:03:37 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2017-904
Contractor Name
Julesburg Irrigation District
Contract Type
Loan
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
* 44 COLORADO Reconstruction of the Harmony No.1 <br /> co '% Conserv ionB Measurement Structure <br /> Water <br /> Conservation Board <br /> Julesburg Irrigation District <br /> May 2016 Board Meeting <br /> LOAN DETAILS <br /> Project Cost: $224,000 <br /> km._ <br /> i <br /> � <br /> CWCB Loan (with Service Fee): $203,616 6 <br /> Loan Term and Interest Rate: 30 years 1.70% llir 4,40 <br /> ~� sp + <br /> Funding Source: Construction Fund <br /> e* <br /> BORROWER TYPE iiaC� iti <br /> Agriculture Municipal Commercial <br /> 100% 0% Low - 0% Mid - 0% High 0% <br /> PROJECT DETAILSIPlkl%LNIIIr3 <br /> Project Type: Ditch Rehabilitation Itilir .PI*,( <br /> Average Annual Delivery: 54,423 AF <br /> L( 0 C A TION <br /> The Julesburg Irrigation District (District), part owner and County: Sedgwick <br /> the operator of the Harmony No. 1 Canal, delivers both Water Source: South Platte River <br /> Direct Flow rights and Storage water rights to the Drainage Basin: South Platte River <br /> Julesburg Reservoir. The Canal diverts water from the Division: 1 District: 64 <br /> South Platte River approximately three miles southwest <br /> of the town of Crook, Colorado. The Canal delivers direct <br /> flow irrigation water, storage water and augmentation water to approximately 17, 000 acres of land <br /> controlled by the Harmony Ditch Company and Julesburg Irrigation District. The Canal can also be used <br /> to deliver irrigation water to an additional 6,000 acres thru the Julesburg Reservoir rights administered <br /> to the Petersen Canal as a supplemental source if supplies at the Petersen head gate are not adequate. <br /> The existing 20 foot Parshall Flume has structural damage that will cause failure. The District wishes to <br /> replace the existing structure with a new structure located just upstream, prior to the 2017 reservoir <br /> fill season beginning in November 2016. The purpose of this project is to provide a reliable <br /> measurement structure to accurately measure the flow of the Harmony No. 1 Canal during the <br /> diversion of water for the various water rights being used by the Julesburg Irrigation District. <br /> "k 48, ''' I 441 <br /> 1 41 ;t. %;,4, 21< r t <br /> I <br /> ARU o f NE w l - , .. <br /> r y Lf <br /> , <br /> s/ 5-Atte-hot � i wi -- 11 <br /> jr � <br /> ; I <br /> i W <br /> / # Jules gil <br /> .c X; <br /> 4.t•^ .. <br /> Project Site <br /> C <br /> C, <br /> Sterling <br /> Water Project Loan Program - Project Data Sheet <br />
The URL can be used to link to this page
Your browser does not support the video tag.