Laserfiche WebLink
Julesburg Irrigation District Agenda Item 21c <br /> May 18-19, 2016 Board Meeting(Updated May 20, 2016) <br /> Page 3 of 4 <br /> Project Description <br /> The purpose of the Project is to provide a reliable measurement structure for accurately measuring flow <br /> in the Harmony No. 1 Canal during the diversion of water for the various water rights being used by the <br /> Julesburg Irrigation District. Three alternatives for this Project were considered: <br /> Alternative 1 - Take no action: This was considered unacceptable because the failure of the existing <br /> structure would make it not possible to measure water delivered, as required by the State Engineers <br /> Office. <br /> Alternative 2 - Rehabilitate the existing structure: This alternative was ruled out because of the <br /> deteriorated and undermined condition of the concrete and sheet piling of the old structure. To <br /> rehabilitate the existing structure in-place would drive expenses up to a point of near-total replacement <br /> cost for a new structure, but would not address the issue of failed subgrade underlying the structure. <br /> Selected Alternative 3 - Construct a new structure: This alternative was chosen to ensure continued <br /> operation of a crucial element of the system. This alternative involves the bypass of residual flows, de- <br /> watering the Project site, excavating the area upstream of the existing structure, constructing a new <br /> weir, placing riprap on the upstream and downstream abutments, and removal of the old structure. <br /> The estimated cost of the Project originally was quoted as $216, 729 by Yost Construction and $219,810 <br /> by Concrete Specialties. The bids were determined by the District to be too high, but in further <br /> conversations with Concrete Specialties, it was suggested to build the structure under a time-and- <br /> materials contract with contingencies, with an expected base cost of $160,000. The District has <br /> previously hired Concrete Specialties for its Outlet Works project, Inlet Works project, as well as the <br /> Lodgepole Creek Structure; all of which were financed with CWCB loans. <br /> TABLE 2: ESTIMATED PROJECT COSTS <br /> Task Cost <br /> Design and Permitting $4,000 <br /> Construction $160,000 <br /> Contingency $60,000 <br /> Total $224,000 <br /> Permitting: The District has existing easements for the canal, and is exempt from 404 <br /> permitting, as Project construction is for an irrigation diversion and related structure. <br /> Schedule: The structure is planned be built in late September through late October of 2016 to <br /> allow for filling the Julesburg Reservoir in water year 2017, which begins November 2016. <br />