My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PO 12-12 Final Deliverable
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
PO 12-12 Final Deliverable
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2016 3:24:46 PM
Creation date
5/13/2016 3:24:35 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
PO 12-12
Contractor Name
Rio Grande Canal Water Users Association
Contract Type
Grant
Water District
20
County
Rio Grande
Loan Projects - Doc Type
Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
IMPACTS <br /> Risks associated with this project are minimal. There is widespread support of hydroelectric <br /> generation in this community,as well as low environmental impacts. <br /> The only potential perceived environmental impact of the project would be associated with the <br /> entrapment of fish in the turbine. This is one reason why the Natel SLH Hydroengine was selected <br /> for this site.Additional screening measures have been included in the construction plan and budget <br /> to ensure that fish are not affected by this project. <br /> The FERC permitting process has been initiated as previously mentioned. Using the streamlined <br /> permitting process will expedite permitting and therefore lower the associated risks. <br /> Rio Grande Canal Water Users Association I Project Description 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.