My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Rio Grande - Rio Grande Reservoir Muli-Use Enlargement_C150402 Pay Requests
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
Rio Grande - Rio Grande Reservoir Muli-Use Enlargement_C150402 Pay Requests
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2017 1:54:43 PM
Creation date
5/13/2016 1:21:40 PM
Metadata
Fields
Template:
WSRF Grant Information
Basin Roundtable
Rio Grande
Applicant
San Luis Valley Irrigation District
Description
Preliminary Design Multi-Use Rio Grande Reservoir Rehabilitaton and Enlargement Project
Account Source
Statewide
Board Meeting Date
3/13/2007
Contract/PO #
C150402
WSRF - Doc Type
Invoicing/Disbursements
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Oct 10 Q8 03:27p <br />_ .. <br />.+ <br />S 55 17th Street, S u rte 7100 <br />Denver, Co�aaoo 80292 <br />te : 303 363-2300 <br />fax: 303 3083003 <br />September 30, 2008 <br />Mr. Travis Srnith <br />San Luis Valley Irrigation District <br />P.O. Box 637 <br />Center, CO 81125 <br />719-754-3616 p.2 <br />Subject: Ri� Grande Reservoix Enlargement Study: Phase 2- Invoice No.12 <br />Dear Mr. Smith: <br />Enclosed please find Invoice No. I2 for the abnve-referenced project for the period from July <br />27, 2008 through September 2(}, 2Ql?8. Cost for services rendered during t1�is period total <br />$14,666.39, far a total invaiced to date of $254,116.4T or 98.49 percent of the total contract <br />value, During this period, CDM completed th� activities below, and a summary table of <br />charges by task and type of cost fallows: <br />Task 1- Geotech Analysis: Final report received from Deere and Ault and was incorporated <br />inta CDM draft report. <br />Task 2- Wetlands Analysis: Received cultura� resaurces survey frorn Sugnet and Moore. <br />Incorporated other deliverabies into CDM report. <br />Task 3- Hyc�rology: Incorporated spillway. design sertion into report. Finalized the <br />Reservoir reoperation and optimization model that was presented at the August 11 <br />enviranmental interest Reservoir tour and the August 12 Basin Raundtable <br />Task 4- Agreements: Collaboration with Distric�s legal counsel on drafting agreements and <br />incorporation into the draft repart, development and integratian vf agreememts into reservoir <br />model. <br />Task 5- Meeting and Reports: Tnternal coordinatinn, preparation of report. Attend.ed and <br />presented at the August 1I environrnental interest I�eservoir tour and the August 12 Basin <br />Roundtable. <br />75SLVICWIanepamerMllrnroicee�Phese2llrnd�128•29�t8_aowr.cbc 8�D200S <br />consulting • engineering • cqnstruction • operations � <br />
The URL can be used to link to this page
Your browser does not support the video tag.