Laserfiche WebLink
DOLORES WATER CONSERVANCY DISTRICT WATER ACTIVITY ENTERPRISE <br /> RESOLUTION No. 00- 01 <br /> RESOLUTION APPROVING THE LOAN OF $75,000 FROM THE COLORADO WATER <br /> CONSERVATION BOARD TO THE DOLORES WATER CONSERVANCY DISTRICT AND <br /> THE DOLORES WATER CONSERVANCY DISTRICT WATER ACTIVITY ENTERPRISE <br /> TO PERFORM A FEASIBILITY STUDY FOR THE,REVELOPMENT OF ADDITIONAL <br /> WATER SUPPLIES. <br /> WHEREAS,the Dolores Water Cons t Dis �' .(th ')'bistrict") is a water <br /> conservancy district established urs t to and verve ,` °�-� <br /> P �` � olorado statute, C.R.S. § 37-45- <br /> 101, et seq., to conserve and develop I Water resour the Dolores River and its tributaries <br /> in Southwest Colorado; and s ' ".y. <br /> WHEREAS, the Diet is IScate ,in Delores and Montezuma Counties, Colorado; and <br /> N� <br /> WHEREAS, the Dolores Water Conservancy District Water Activity Enterprise(the <br /> "Enterprise")is an enterprise Within the meaning of§ 37-45.1-101 et seq., C.R.S. (1998) and <br /> Article X, Section 20 of the Colorado Constitution, and was established by Resolution No. 93-02 <br /> of the District, dated December 14, 1993; and <br /> WHEREAS, the Enterprise and the District applied to the Colorado Water Conservation <br /> Board (the"CWCB") for a loan to finance the costs of a feasibility study(the "Study") of <br /> alternatives for development of additional water supplies(the "Project"), at a cost of <br /> approximately$150,000. <br /> WHEREAS, at its July 13-14, 1998 meeting, the CWCB approved a loan to the District and <br /> the Enterprise in an amount not to exceed$75,000 or fifty percent(50%) of the cost of the Study, <br /> whichever is less, at an interest rate of 3.5%per annum for a term of up to 10 years to finance the <br /> costs of the Study(the "Loan"); and <br /> WHEREAS, the CWCB now desires to loan money to the District and the Enterprise for <br /> this Study upon terms and conditions mutually agreed upon with the District and the Enterprise. <br /> NOW,THEREFORE,the Board of Directors of the Enterprise("Enterprise Board") <br /> resolves as follows: <br /> 1. The Enterprise and the District shall have the Study prepared for the Project in <br /> accordance with a "Scope of Work"prepared by the consulting engineer of the District and the <br /> Enterprise, Steve Harris, P.E. The CWCB has reviewed and approved the Scope of Work, which <br /> is attached to the Loan Contract. <br /> 2. The Enterprise and the District shall provide the CWCB with two (2) copies of the <br /> final report of the Study, prepared in compliance with the Scope of Work, within two (2) years of <br /> the date of the Loan Contract unless the CWCB agrees in writing to an extension of such time. <br /> Appendix B to Loan Contract C150003 <br />