My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CT2016-2794 Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
CT2016-2794 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2016 11:33:20 AM
Creation date
5/10/2016 11:33:17 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
CT2016-2794
Contractor Name
Lake McIntosh Reservoir Company
Contract Type
Loan
County
Boulder
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BORROWER: LAKE MCINTOSH AGENCY NAME: COLORADO WATER <br /> RESERVOIR COMPANY CONSERVATION BOARD <br /> REQUESTED LOAN AMOUNT: $1,710,000 CONTRACT TYPE: LOAN/PRIVATE <br /> LOAN ORIGINATION FEE: $17,100 CWCB CMS: 86938 <br /> TOTAL LOAN AMOUNT: $1,727,100 CORE: CT2016-2794 <br /> LOAN CONTRACT <br /> This contract ("CONTRACT" or "LOAN CONTRACT") is made between the State of <br /> Colorado for the use and benefit of The Department of Natural Resources, Colorado <br /> Water Conservation Board ("CWCB" or "State"), and Lake McIntosh Reservoir <br /> Company, 4309 State Highway 66, Longmont, Colorado, 80504 ("BORROWER"), a <br /> Colorado corporation. <br /> FACTUAL RECITALS <br /> 1. CWCB authority exists in the law, and funds have been budgeted, appropriated and <br /> otherwise made available and a sufficient unencumbered balance thereof remains <br /> available for encumbering and subsequent payment of this CONTRACT;and <br /> 2. Required approval, clearance, and coordination have been accomplished from and <br /> with appropriate agencies; and <br /> 3. On January 26, 2016 the CWCB approved a loan request from the BORROWER for the <br /> Lake McIntosh Outlet Works Repair ("PROJECT"), to restore Lake McIntosh's <br /> functionality by repairing the collapsed outlet pipe and sinkhole. The total estimated <br /> Project Cost is $1,900,000. The Total Loan Amount ("Loan Amount") of 1,727,100 <br /> which includes a one percent (1%) loan origination fee of $17,100 is payable over 30 <br /> years at an interest rate of 2.70%; and <br /> 4. The PROJECT SUMMARY, attached as APPENDIX 1, and incorporated herein contains <br /> BORROWER Information (Section 1), the PROJECT Description (Section 2), CWCB's <br /> authority for making this loan (Section 3), and CWCB Approval or Legislative <br /> Authorization (Section 4), identifying the amount of the loan and the terms of <br /> repayment. The PROJECT SUMMARY also contains sections on BORROWER'S debt, <br /> pledged revenues and property, procedures and eligible expenses. <br /> 5. The CWCB now desires, by this CONTRACT, to loan money to the BORROWER for this <br /> PROJECT upon mutually agreeable terms and conditions. <br /> THEREFORE, in consideration of the mutual and dependent covenants contained <br /> herein, the parties agree as follows: <br /> A. LOAN PROVISIONS <br /> 1. Loan Origination Fee. The LOAN AMOUNT shall include (1) the amount of the funds <br /> loaned by the CWCB to the BORROWER for the PROJECT and (2) a loan origination <br /> fee of one percent (1%) of the requested loan amount. In the event that the <br /> BORROWER does not use the full LOAN AMOUNT authorized, the parties shall amend <br /> this CONTRACT or exercise an OPTION LETTER (as outlined in section A.2. and <br /> Page 1 of 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.