My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150252 Paid in Full Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C150252 Paid in Full Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 8:25:16 AM
Creation date
5/10/2016 10:41:20 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150252
Contractor Name
Henrylyn Irrigation District
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
For Project costs: The BORROWER shall prepare a periodic progress report which <br /> contains a statement of the PROJECT costs expended for that period and shall <br /> forward said statement to the CWCB. After receipt of the periodic progress report <br /> from the BORROWER, and review and acceptance of the items therein as eligible <br /> expenses as described below, the CWCB will pay to the BORROWER the amount set <br /> forth in the report or such portion that has been approved by the CWCB. Such <br /> payment shall be made within thirty (30) days from the CWCB's approval of each <br /> progress report. <br /> • <br /> SECTION 11 —TIME FOR PERFORMANCE . <br /> PROJECT Beginning: Upon Effective Date of this Contract (the'date*this contract is <br /> signed by the State Controller or his designee). <br /> PROJECT Finish: Two (2) years from the Effective Date of this Contract <br /> • <br /> acurk <br /> Mir ii4M <br /> Appendix 1 to Loan Contract C150252 <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.