My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150252 Paid in Full Contract
CWCB
>
Loan Projects
>
DayForward
>
5001-6000
>
C150252 Paid in Full Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2016 8:25:16 AM
Creation date
5/10/2016 10:41:20 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150252
Contractor Name
Henrylyn Irrigation District
Contract Type
Loan
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
year loan). Collateral for this loan is a conveyance of an individual 1/10 interest in <br /> Prospect Reservoir. The second is a 1981 loan for $260,000 for the purpose of <br /> repair of damages to the Horse Creek Reservoir Dam, with a remaining principal <br /> amount of $164,220 and an annual payment of $15,153 through 2022 (40-year loan). <br /> Collateral for this loan is a conveyance of an undivided 1/2 interest in the Horse Creek <br /> Reservoir. Also, Borrower also has an interest-free $1,000,000 loan with the U.S. <br /> Bureau of Reclamation for the purpose of concrete lining its ditch laterals and canals, <br /> with a remaining principal amount of $79,288 and an annual payment of $32,800 <br /> through 2008. In addition, Borrower has a $75,861 loan with CNH Capital for <br /> purchase of an excavator, with a remaining principal amount of $44,115 and an <br /> annual payment of $20,513 through 2009. Collateral for this loan is the excavator <br /> itself. The last two loans will be retired prior to the s f CWCB loan repayment <br /> (2010). <br /> SECTION 6-COLLATERAL <br /> The collateral provided for this loan, as eviden e Trust, in <br /> the form attached as Appendix 5 and Appendix a d in, shall be <br /> a 10% interest in Horse Creek Reservoir and a 10% interest in servoir, as <br /> more particularly described in the attached Deeds of Trust ("Collateral" . <br /> SECTION 7—ADDITIONAL CONDITIONS&CONTRACT REQUIREMENTS <br /> No additional conditions or contract requirements <br /> SECTION 8—CONSTRUCTION FUND PROGRAM PROCEDURES <br /> A. The BORROWER shall employ an engineer, registered in the state of Colorado to <br /> prepare plans and specifications for the PROJECT. <br /> B. The BORROWER'S and the Engineering Consultant's Agreements and the plans and <br /> specifications must be submitted to the CWCB staff for verification of compliance <br /> with the terms of this Contract when available prior to bidding. Any modifications to <br /> the plans and specifications must be approved in writing by the CWCB staff. <br /> C. For plans and specifications for all jurisdictional dams and reservoirs, as defined by <br /> § 37-87-105 C.R.S., the BORROWER shall provide a letter of approval from the State <br /> Engineer's Office prior to construction. <br /> D. CWCB staff must be present at bid opening Ind must approve the award of the <br /> construction contract. <br /> E. The BORROWER shall contract for the construction of the work with responsible and <br /> capable Construction Firms, which said Construction Firms shall be selected by the <br /> BORROWER and found acceptable by the CWCB staff. <br /> F. The BORROWER must provide a copy of the executed construction contract <br /> documents consisting of the contractor's proposal, construction contract, <br /> performance bond, payment bond, notice of award, notice to proceed, sample <br /> change order, and sample field order, as well as the advertisement for bid and bid <br /> bond at bidding. After the CWCB staff verifies that these documents comply with <br /> Appendix 1 to Loan Contract C150252 <br /> Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.